Instruction Manual WGM701 Wasp
InstruTech
Page 23
Slide a new ionization chamber (2) into the
measuring chamber (3) until the mechanical stop is
reached and mount the retaining ring (1).
It is recommend to perform a leak test (leak rate <1×10
-9
mbar l/s).
Carefully slide the measuring chamber (3) (clean or new) into the electronics unit (5) until the mechanical
stop is reached.
Pins aligned
straight.
Fasten the measuring chamber (3) by means of the hexagon socket set screw (4).