Chapter: Lifting and handling
64
M10-17541-EN
Figure 18. Righting a Load Frame Using a Crane
Legend for
4. Slowly lift the frame until the weight of the frame is fully supported by the slings.
5. Remove all bolts and brackets that attach the frame to the shipping skid.
6. Locate any frame feet that may have been removed in order to bolt the frame to the
skid and reinstall them in the locations shown in
.
1
2
Label
Description
1
Two slings around the crosshead.
2
Two slings attached to two M16 hoist rings screwed into frame base beam.
Summary of Contents for 34FM-100
Page 1: ...Model 34FM 100 Dual Column Floor Model Preinstallation Manual M10 17541 EN Revision A...
Page 8: ...Preliminary Pages 8 M10 17541 EN...
Page 12: ...Preliminary Pages 12 M10 17541 EN...
Page 50: ...Chapter Specifications 50 M10 17541 EN...
Page 58: ...Chapter Risk reduction and safe use 58 M10 17541 EN...
Page 72: ...Chapter Lifting and handling 72 M10 17541 EN...
Page 74: ...74 M10 17541 EN...
Page 75: ......
Page 76: ...www instron com...