![Instron 34FM-100 Preinstallation Manual Download Page 26](http://html1.mh-extra.com/html/instron/34fm-100/34fm-100_preinstallation-manual_2070133026.webp)
Chapter: Requirements
26
M10-17541-EN
Site requirements
Proper site preparation is imperative so that the testing system operates in accordance
with its specifications.
Frame location
The load frame must not be located against a wall or other object that interferes with air
ventilation around the frame. Proper air ventilation is required to dissipate the heat
generated from the frame base.
shows the minimum clearance necessary on each side and to the
rear of the frame to allow for adequate ventilation and periodic access for service.
The clearance to the rear is necessary to allow service without removing any installed
large accessories.
Figure 3. Minimum clearances in mm (in)
Floor loading
The supporting floor must be checked for its weight loading and be able to support the
weight of the load frame and any other accessory parts that may have been purchased.
305
(12)
305
(12)
762 (30)
Summary of Contents for 34FM-100
Page 1: ...Model 34FM 100 Dual Column Floor Model Preinstallation Manual M10 17541 EN Revision A...
Page 8: ...Preliminary Pages 8 M10 17541 EN...
Page 12: ...Preliminary Pages 12 M10 17541 EN...
Page 50: ...Chapter Specifications 50 M10 17541 EN...
Page 58: ...Chapter Risk reduction and safe use 58 M10 17541 EN...
Page 72: ...Chapter Lifting and handling 72 M10 17541 EN...
Page 74: ...74 M10 17541 EN...
Page 75: ......
Page 76: ...www instron com...