background image

Installation

The boiler must be installed on a horizontal work 
surface with sufficient strength to support its weight. 

Locate in an area where there is adequate space to 
use the boiler safely (e.g. free from risk of congestion 
and tripping hazards).   

Connection to Mains Water Supply:

Connect the WRAS approved water filling hose 
(3/4”BSP) to the inlet connection point on the back 
of the boiler and the other end to the mains water 
supply, via an accessible isolating tap with a ¾”BSP 
thread.

IMPORTANT: If micro-bore pipe is used instead of 
the inlet hose supplied, the size must be minimum 
OD 3/8”(10mm).

The water supply must have a pressure not 
exceeding 7bar (96psi), and no lower than 2bar 
(28psi) NOTE: If your water pressure exceeds 7bar,  
fit a suitable pressure reduction valve.

We regret that Instanta cannot be held responsible 
for any machine malfunctions if the water pressure 
exceeds that stated. If in doubt, consult your water 
supply company.

Electrical Connection:

The boiler must be Earthed.

Your machine is supplied with a standard 13amp 
bonded plug with a 13amp fuse. 

Overflow:

 The drip-tray has a limited capacity and 

is designed to handle small spillages and drips. 
Wherever possible, we strongly recommend that it is 
connected to a permanent waste.

We have provided two overflow outlet/connection 
points to choose from;

1).   The normal overflow is directed to the  
 drip-tray. 

2).   Alternative overflow is at the back of the  

 

 machine.

If the drip-tray option [1] is to be used for the 
overflow, we can supply a 15mm fitting kit

 (Pt. No: 

DTK2) available from Instanta Spares Department 
(01704 502905).

 This can be fitted into the base of 

the drip-tray in place of the rubber blanking plug.

If the rear overflow option is chosen [2], the front 
overflow-pipe [behind curved-front panel], must be 
blocked-off using the tapered-rubber blanking bung 
provided. Pipe-work should then be provided 
  

between the rear-overflow connection  
[1/2”bsp-15mm] and a suitable waste/drain 

[NOTE: Whichever overflow connection is chosen, 
the diameter of the pipe used must be no less than 
15mm and an air gap provided within 300mm of 
the connection point. Failure to provide an air gap 
within this distance could cause an air lock which 
would stop the water discharging in the event of an 
overflow].

Whilst every reasonable precaution is taken to prevent 
an overflow, Instanta cannot be held responsible 
for any damage caused as a result of incorrect 
installation or blockage of the overflow or failure to 
direct the overflow to a safe outlet.

 

 

Operation

First Use

 (once water and electrical connections 

have been made);

Switch boiler on.  

The screen will run through an initial self-diagnostic 
check before starting to fill with water (screen reads; 
“BOILER FILLING”).

Once primed with water, the boiler will begin to heat 
(screen reads; “BOILER HEATING”).

When the correct temperature has been reached, the 
display will simply read “BOILER READY”. 

The boiler will then continue in a heat/fill cycle until the 
tank is at full capacity. (During the heat/fill cycle, small 
amounts of water are added to ensure the water at 
the tap is always at the correct temperature). 

IMPORTANT NOTE: In normal daily use, the boiler 
may be used as soon as the “BOILER READY” 
message is displayed, but on first install, wait at 
least 15 minutes before starting to use.

Regular Daily Use

Switch boiler on and wait for the screen to show 

BOILER READY

”. The water will then be at the 

correct temperature.
Dispense water by pressing button.  
(CAUTION: Boiler dispenses near-boiling water). 

Eco Mode / Power Saving

The ECO mode is activated by pressing the ECO 
button. The screen reads “ECO MODE ACTIVE”. 
This saves energy by switching the boiler operating 
capacity to half volume, ideal on quiet days in the 
season. Simply push the ECO button again to revert 
to full capacity.   

4

Summary of Contents for CTSP15PB

Page 1: ...The Professional s Choice CTSP15PB SureFlow Plus Touch Installation And User Instructions...

Page 2: ...nd all relevant local and national standards including the following Health and Safety at Works Act IEE regulations Local and national building regulations BS Codes of practice Water supply regulation...

Page 3: ...system Technical Information Outer casing and tank constructed in Type 304 stainless steel Internal baffle plates for condensing steam within the tank are made from Type 316 stainless steel The tank i...

Page 4: ...sing the tapered rubber blanking bung provided Pipe work should then be provided between the rear overflow connection 1 2 bsp 15mm and a suitable waste drain NOTE Whichever overflow connection is chos...

Page 5: ...g Lock Mode the optional key supplied must be synced to the machine as follows a Enter program mode as described above and scroll through menu until the display shows PROGRAM LEARN KEYS Hold for 3 sec...

Page 6: ...nimise energy consumption and also retain the water quality Full de scale of Tank Probes Disconnect machine from power supply Empty the machine and allow to cool Remove outer lid spring clips Remove t...

Page 7: ...ERMISTOR OC Temperature sensor has become disconnected or is faulty Contact supplier HEAT THERM FAIL Either the Over boil or Boil dry safety cut outs have activated Switch boiler off and back on after...