background image

The Professional’s Choice

CTSP15PB

SureFlow Plus Touch

Installation And User Instructions

Summary of Contents for CTSP15PB

Page 1: ...The Professional s Choice CTSP15PB SureFlow Plus Touch Installation And User Instructions...

Page 2: ...nd all relevant local and national standards including the following Health and Safety at Works Act IEE regulations Local and national building regulations BS Codes of practice Water supply regulation...

Page 3: ...system Technical Information Outer casing and tank constructed in Type 304 stainless steel Internal baffle plates for condensing steam within the tank are made from Type 316 stainless steel The tank i...

Page 4: ...sing the tapered rubber blanking bung provided Pipe work should then be provided between the rear overflow connection 1 2 bsp 15mm and a suitable waste drain NOTE Whichever overflow connection is chos...

Page 5: ...g Lock Mode the optional key supplied must be synced to the machine as follows a Enter program mode as described above and scroll through menu until the display shows PROGRAM LEARN KEYS Hold for 3 sec...

Page 6: ...nimise energy consumption and also retain the water quality Full de scale of Tank Probes Disconnect machine from power supply Empty the machine and allow to cool Remove outer lid spring clips Remove t...

Page 7: ...ERMISTOR OC Temperature sensor has become disconnected or is faulty Contact supplier HEAT THERM FAIL Either the Over boil or Boil dry safety cut outs have activated Switch boiler off and back on after...

Page 8: ...del Serial Number label on right hand side of machine This is essential Guarantee Your boiler is guaranteed for two years from date of installation Our guarantee includes on site labour and parts for...

Reviews: