background image

Rack-Mounted Server Installation Guide

V1.0

Rail-Kit Contents

Installing the Rails

1

1

2

Align the pins on the front bracket to the front of the rack. Press the locking 

latch as indicated by arrow ①, and then insert the pins as indicated by 
arrow ② until the pins are fully engaged.

3

Repeat Step 1 and Step 2 for the other rail.

NOTE: 

The front end and the rear end of the rail, and the two rails MUST be 

installed at the same height. 

4

Align the server with the rails, and slide the chassis all the way into the rack.

Removing the Rails

Align the pins on the rear bracket to the desired position of the back of the 

rack. Press the locking latch as indicated by arrow 

, and then insert the 

pins as indicated by arrow 

 until the pins are fully engaged.

Open both handles on the front of the server, and then tighten the two 
thumb screws.

2

Slide the server out, and then remove 
the server from the rack.

3

Disengage the pins from the rack.

5

Open both handles on the front of the server, and then loosen the two 
thumb screws.

Outer Rail

Back-Sliding Rail

Front Bracket

Rear Bracket

1

2

1

2

1

2

3

4

Locking 

latch

Locking 

latch

Rail

 3

Summary of Contents for NF5280M6

Page 1: ...m between the rear side of the server and the inner side of the cabinet s rear door Always keep the air baffles in place to ensure proper air flow and avoid air turbulence in the server room Installation must comply with local and regional electrical regulations To reduce the risk of personal injury fire or damage to the server DO NOT overload the AC supply that provides power to the rack Servers ...

Page 2: ...ay into the rack Removing the Rails from the Server Removing the Rails from the Rack Align the pins on the rear bracket to the desired position of the back of the rack Press the locking latch as indicated by arrow and then insert the pins as indicated by arrow until the pins are fully engaged Repeat Step 1 and Step 2 for the other rail kit NOTE The front end and rear end of the rail and the two ra...

Page 3: ...e rack holes and the latch clicks into place Repeat steps 1 and 2 to install the other side And pull the inner rails out of the rack until they lock into place Notice Keep the left and right rails on the same level Remove the screws from the left and right handles on the system Pull out the system and press the side release lock buttons on both rails and lift the system up and away from rails Pres...

Page 4: ...rails and slide the chassis all the way into the rack Removing the Rails Align the pins on the rear bracket to the desired position of the back of the rack Press the locking latch as indicated by arrow and then insert the pins as indicated by arrow until the pins are fully engaged Open both handles on the front of the server and then tighten the two thumb screws 2 Slide the server out and then rem...

Reviews: