FUNCTIONAL TRAINER ASSEMBLY INSTRUCTIONS
STEP 1
A.) Do not tighten the Nuts and Bolts until instructed to do so.
B.) Place the Lower Cross Brace (#4) between the Right & Left
Stations (#1 & #2) in the mid-span.
C.) Attach one end of the Lower Cross Brace to the Right Station.
Secure it with two M10 x 70 Allen Bolts (#19) four Ø 10 Washers
(#25), and two M10 Aircraft Nuts (#24). Repeat the same
procedure to install the other side.
D.) Repeat Procedure B & C to install the Upper Cross Brace (#5).
E.) Place the Pull Up Bar Assembly (#3) on top of the Right and Left
Stations.
F.) Secure each end with two M10 x 25 Allen Bolts (#20), two Ø 10
” Lock Wash
ers (#23), and Ø 10 Washers (#25).
G.) Securely tighten all Nuts and Bolts installed.
Page 6
05/2020
Summary of Contents for FTX
Page 6: ...HARDWARE SIZING CHART Page 3 05 2020 ...
Page 7: ...Page 4 05 2020 ...
Page 8: ...Page 5 05 2020 ...
Page 10: ...Page 7 05 2020 ...
Page 12: ...Page 9 05 2020 ...
Page 14: ...Page 11 05 2020 ...
Page 15: ...DECAL PLACEMENT Page 12 05 2020 ...
Page 19: ...Page 15 05 2020 ...