![insize ISHB-D200 Operation Manual Download Page 4](http://html1.mh-extra.com/html/insize/ishb-d200/ishb-d200_operation-manual_2068573004.webp)
5
6
4
Press
the
front
lever
and
make
fit
blades
into
the
V
groove
of
the
frame. Please
note
the blades
both
up
and
down.
should
be
properly fitted
frame with V groove
blade
blade
5
Re-mount the top cover.
6
Turn
down
the
stage
and
remove
the
protection
foam, also the
move down the cover of the thread rod and then put on the stage.
Note The thread rod should be oiled for rust protection.
:
7
Insert
the eyepiece into the sleeve and connect the cable to the
port on the side of machine.
8
Connect the power cable and turn on the machine.
Note: The eyepiece should be completely inserted in to the
sleeve, otherwise, the measurement will be not accurate.
Operation
Key function:
1
hardness value
conversion
diameter of indenter
diameter indentation
dwell time
finished test times
test force
PRINT:
Print the test data (the first indentation is not included).
DISPLAY
CLR-F:
Set Zero to Initial Test Force.
:
Display test data (the first indentation is not included),
the screen will return back to operating page after press OK key.