Insignia RW108 Installation Manual Download Page 18

 

www.insigniashowers.com

 

Last Modified: 07/10/2021

 

 18 

Sauna Usage & Safety Guide

 

 

1.

 

Never leave children unattended in the Sauna. 

 

2.

 

Regulate the temperature of sauna before session 

-

 Pre

-

heat time 15

-

30 minutes (from room temperature 20c)

 

3.

 

Never touch the heater panels whilst in operation, possible burning may occur.

 

4.

 

Recommended time of use 15

-

20 minutes per session

 

5.

 

Stay hydrated during each Sauna session.

 

6.

 

Exit the sauna immediately if feeling dizzy, faint or short of breath.

 

7.

 

Do NOT use the sauna if you

re pregnant, have a heart condition, have low or high blood pressure. If you

re unsure consult 

your GP before use.

 

8.

 

If you have any underlying health conditions which you feel could be aggravated by an increase in temperature, consult 
your GP before use.

 

9.

 

If you begin to have any issues with your health after using a sauna, stop immediately and consult your GP regarding your 
symptoms before continuing to use.

 

10.

 

Consult your GP before using the steam room if you

re on medication at all, especially with drowsy side effects.

 

11.

 

Never use this sauna if you have been drinking alcohol or under the influence of other substances. 

 

12.

 

Do not put combustible material on the heaters at any time.

 

13.

 

Always turn power supply off after use. 

 

 

Summary of Contents for RW108

Page 1: ...rt Call 01908 317512 and request technical support for aiding your installation Replacements Parts Inside of your warranty period visit https www insigniashowers com click support and make a warranty...

Page 2: ...l 6 Right Back Panel Install 7 Large Bench Heater Install 8 Large Bench Install 9 Small Bench Heater Install 10 Small Bench Install 11 Bench Block Install 12 Connecting Door and Fixed Glass Panels 13...

Page 3: ...this booklet with great care to ensure you get the best out of your build and have a Sauna that will last for many years to come Like everything in order to obtain a first class product that will ser...

Page 4: ...hin current laws and IP directives 2 Preferred Wire into isolated fused feed connecting directly to the house consumer service box Always use protection against electrical surge Your shower should be...

Page 5: ...Roof Floor 1 1 1 2 1 1 Screw Pack 40mm Screw Wooden Dowel 20 22 VERY IMPORTANT Have you got everything If not please contact the Insignia directly on 01908 317 512 Remember NEVER book your tradesman...

Page 6: ...www insigniashowers com Last Modified 07 10 2021 06 Step 1 Placing the base and the left back panel in position...

Page 7: ...www insigniashowers com Last Modified 07 10 2021 07 Step 2 Connecting the right back panel to the left back panel 3x 35mm Screws Please Note Screws connect on the interior of the Sauna...

Page 8: ...www insigniashowers com Last Modified 07 10 2021 08 Step 3 Installing long bench heater Connect heater panel to back panel using the wires below Slide the bench heater between the two wooden struts...

Page 9: ...www insigniashowers com Last Modified 07 10 2021 09 Step 4 Installing the long seat Slide the top of the seat into position resting on the wooden struts...

Page 10: ...www insigniashowers com Last Modified 07 10 2021 10 Step 5 Installing short bench heater Connect heater panel to back panel using the wires below Slide the bench heater between the two wooden struts...

Page 11: ...www insigniashowers com Last Modified 07 10 2021 11 Step 6 Installing the short seat Slide the top of the seat into position resting on the wooden struts...

Page 12: ...www insigniashowers com Last Modified 07 10 2021 12 Step 7 Installing the side bench blocks Slide the bench blocks into position...

Page 13: ...Modified 07 10 2021 13 Step 8 Connecting the door and fixed glass panels Align the connection left located along the door and the front fixed glass panels Slot together and push the fixed glass panels...

Page 14: ...insigniashowers com Last Modified 07 10 2021 14 Step 8 Installing the door and fixed glass panels to the back panels Lift into position and connect the fixed panels to the front fixed glass 6x 35mm Sc...

Page 15: ...ers com Last Modified 07 10 2021 15 Step 9 Installing the Roof The roof simply slots into position Now the Sauna is assembled take the wooden dowels and insert over any screw to give the Sauna a sleek...

Page 16: ...x is located on the roof Take all power cables from the panel heaters and the control panel and connect together Connect the control panel to the lights and speakers located in the roof Also take the...

Page 17: ...na Use this button to start the heaters for the sauna session Button 8 Audio function Use to toggle between radio Bluetooth and USB audio preferences Button 9 10 Mode Use to change the volume the musi...

Page 18: ...have a heart condition have low or high blood pressure If you re unsure consult your GP before use 8 If you have any underlying health conditions which you feel could be aggravated by an increase in...

Page 19: ...ommon crossed out wheelie bin label We accept returns of all products carrying the Insignia brand All other products are either considered outside the scope of WEEE or Insignia is not technically the...

Page 20: ...www insigniashowers com Last Modified 07 10 2021 20...

Reviews: