background image

 

www.insigniarange.com

 

Last Modified: 25/07/2019

 

 15 

Step 7

 

Using the 

ST25 

screws, ensure the back panels are square and you 

are happy with the position of the panels then screw into place.

 

Step 6

 

With the frame now attached to the back panels, locate and fix the glass panels into 

place by pushing them as per the arrows in the adjacent image Making 

sure the edge of the glass with the rubber seal fits into the groove tightly. 

Now screw the glass retaining clips into place using the 

ST14 

screws 

making sure the glass has a tight fit

 

Summary of Contents for INS9002R

Page 1: ...ts Parts inside of your warranty contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO _...

Page 2: ...ion Electrical Requirements What s In The Boxes Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Sealing and Water Testing Control Panel Instruct...

Page 3: ...ny years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your f...

Page 4: ...D ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU DO THIS AND YOUR WARRANTY IS VOID IN REGARDS TO THE ELECTRICAL ITEMS IF THIS IS NOT UNDERT...

Page 5: ...Wire into isolated fused feed connecting directly to the house consumer service box Always use protection against electrical surge Your shower should be treated the same as a home computer A surge pr...

Page 6: ...Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints Not Supplied Supplied Not Supplied Hardware Requirements A Shower Cabin requires 2 x 1 M...

Page 7: ...ed When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build take the unit apart...

Page 8: ...ts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code Description Quantity SP09...

Page 9: ...r plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a comb...

Page 10: ...www insigniarange com Last Modified 25 07 2019 10...

Page 11: ...the small hand back panel to the back column Once you are happy with the alignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and screw together using the ST20 ple...

Page 12: ...lignment run a bead of silicone up the edge and Rubbergum along the bottom of the panels and screw together using the ST20 Step 3 Front Fixed Uprights PLEASE NOTE The uprights have small grooves cut o...

Page 13: ...the picture to the left PLEASE NOTE The screw head needs to bypass the OUTER hole If this does not occur please bore out the outer hole only by about 2 4mm Your front metal work should now look like...

Page 14: ...ge of the curved and the straight fixed glass panels and cut any excess of if required Step 4 Now attach your front metal work to the fitted back panels Once you are happy with the alignment run a bea...

Page 15: ...hen screw into place Step 6 With the frame now attached to the back panels locate and fix the glass panels into place by pushing them as per the arrows in the adjacent image Making sure the edge of th...

Page 16: ...the wheels are at their lowest position and hang on the inner curved rails with the wheels facing the outside of the glass Please note the push button wheels are for the bottom Once all wheels are fit...

Page 17: ...panels are pierced through the existing glass holes with a knife to provide an efficient smooth fitting and location of the accessories We recommend using a screwdriver on the smaller holes Riser Bar...

Page 18: ...strip ensuring the flap is facing the fixed glass panel Handle Ensuring that the inner thread is protruding out from the handle far enough place the handle on the outside of the door and secure by tig...

Page 19: ...shower and note which output the water exits from then turn off the water and swap over the relevant hose Alternatively remove the outer chrome knob by removing the chrome cap and loosening the grub...

Page 20: ...www insigniarange com Last Modified 25 07 2019 20 Electric Box Connections Connect the cables below to the corresponding devices on the shower Antenna Speaker Speaker Roof Light...

Page 21: ...om one side and going around to the back and then to the other side finishing at the front If you have a small leak normally caused through insufficient sealer or air bubble on assembly dry the area t...

Page 22: ...7 Audio Volume Press up or down to increase or decrease the volume in the cabin Button 4 5 Skip button Press to skip radio station on the radio setting When the Bluetooth is activated this will skip t...

Page 23: ...contains many useful items such as is your parts warranty registered advice on cleaning servicing your shower cabin fault finding and many more items This is a MUST to read and not just HELP It saves...

Page 24: ...ass INS9002R 8 Flat front fixed glass Glass Left Hand Part Code Part Description SP074 Monsoon Shower head SP048 Massage jet 2 open ends SP048A Massage jet 1 open 1 closed SP236 Complete riser bar SP1...

Page 25: ...used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All...

Reviews: