www.insigniarange.com
Last Modified: 31/08/2018
11
TO START
Make sure you have a clear space, remember when finished and in place you need access to check your build and
able to pull the shower out for servicing or should you have the need to replace anything!
Take the shower tub and remove all the protective wrapping and fit the waste. In the side of the waste supplied in the
optional fitting kit you will notice a spigot not seen on an ordinary waste. In most cases this is blanked yet should you
have a steam version you need to gently drill this out as this item is for the steam generator drainage and will be con-
nected in the instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit level, adjust the tray feet
accordingly. Once you are happy with the levelling of the tray, you can pull it out to begin the main construction.
Step 1
Attach the uprights to the bottom curved rail using the
ST35
screws. The
end with the groove is designed to sit on the tray, with the flat end
connecting to the roof. Please note the
‘
U
’
shaped channel is meant to
face inwards to allow the glass to fit correctly.
(Thinner rail without Insignia logo on)
PLEASE NOTE
The screw head needs to bypass the OUTER hole. If this does not occur
please bore out the outer hole only by about 2
-
4mm