background image

 

www.insigniarange.com

 

Last Modified: 26/01/2017

 

 18 

Shelf

 

Fix the chrome floating shelf brackets to your glass back panel by using the provided screws. Now attach the chrome tubed bars to your glass shelf as illustrated in the  

below image. Next slide the shelf into your shelf brackets and secure by tightening the grub screw situated on the bottom of the bracket.

 

Accessory Installation

 

Please Note

 

Ensure all grey backing film on the rear of the glass panels are pierced through the existing glass holes 

with a knife to provide an efficient smooth fitting and location of the accessories. We recommend using 

a screwdriver on the smaller holes.

 

Steam Pod

 

Insert the pod from the inside of the shower and attach large white nut            

from the rear.

 

                                          Thermostatic Probe

 

Insert the chrome sleeve into the hole situated below the control panel and secure in 

place with the retaining nut. Insert the rubber grommet into the sleeve and push the 

probe through from the rear of the cabin ensuring the probe protrudes no more than 

6mm. Place a small amount of silicone behind to fully secure in to place.

 

Summary of Contents for GT9001

Page 1: ...s Parts inside of your warranty contact www insigniarange co uk customerService aspx Spares Replacements Parts outside of your warranty contact 0844 800 3069 www insigniarange co uk WARRANTY REG NO __...

Page 2: ...al Requirements What s In The Boxes Screw Pack Contents Plumbing Requirements Starting The Installation Electric Box Connections Steam Generator Connections Sealing and Water Testing MK117 Control Pan...

Page 3: ...ny years to come Like everything in order to obtain a first class product that will serve you well for many years the effort and correctness put into the assembly will reflect in the quality of your f...

Page 4: ...TION TO HOUSE MAINS WHEN YOUR ITEM IS ASSEMBLED ALWAYS USE THE SERVICES OF A FULLY QUALIFIED ELECTRICAN COMPANY TO COMPLETE THE CONNECTION FROM SHOWER TO THE HOUSE SUPPLY LAWS DEMAND IN MANY CASES YOU...

Page 5: ...d two methods 1 Connect within current laws and IP directives using plug and RCD provided with steam version or supply one for non steam version 2 Preferred Wire into isolated fused feed connecting di...

Page 6: ...Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Bacteria Resistant Sanitary Silicone for vertical joints RubberGum Plumbers Mait for waste joints Not Supplied Not Su...

Page 7: ...he unit is assembled When we use the word DRY RUN this means you do not silicone anything just simply construct the shower align drill and screw everything together Once you are happy with the build t...

Page 8: ...replacement missing parts can be obtained free of charge during or after the build Any claims can only be within the timescale permitted 48 hours after delivery and always BEFORE build Product Code D...

Page 9: ...r plumber The end delivery however must fall within the scope above Important Note Do not exceed 3 4 BAR pressure under any circumstances Warranty is void if so as damage will occur If you have a comb...

Page 10: ...de of the waste supplied in the optional fitting kit you will notice a spigot not seen on an ordinary waste In most cases this is blanked yet should you have a steam version you need to gently drill t...

Page 11: ...ce in position on the tray and whilst holding in this position silicone the bottom and align the back left glass panel in the po sition numbered 1 on the adjacent picture and walk around into position...

Page 12: ...he column either side and at the bottom and place the column in be tween the two rear glass panels and screw in position using the ST20 screws please note if your column has a rubber seal at the botto...

Page 13: ...www insigniarange com Last Modified 26 01 2017 13 Step 4 Attach both uprights to your top and bottom rails using the ST35 screws...

Page 14: ...Modified 26 01 2017 14 Step 5 Now using the ST20 screws screw in position as indicated by the image Step 6 Now use the corner uprights and place into position on either side of the frame as indicated...

Page 15: ...d SW9 washers screw in position as indicated by the image A B Step 8 Meet the frame to the side panels as per the hand opening of your choice Note If the insignia logo is at the bottom simply peal it...

Page 16: ...www insigniarange com Last Modified 26 01 2017 16 Step9 Now using the ST20 screws and SW9 washers screw in position as Indicated by the image...

Page 17: ...signiarange com Last Modified 26 01 2017 17 Step 10 Screw down the roof to the back and side panels as well as the back walls to the shower tray using ST25 screws and SW9 washers from the rear of the...

Page 18: ...the glass panels are pierced through the existing glass holes with a knife to provide an efficient smooth fitting and location of the accessories We recommend using a screwdriver on the smaller holes...

Page 19: ...ttach the chrome riser bar to the glass wall ensuring the water inlet is inserted through the lower large hole and hand tightened from the rear side Now tighten the chrome shower holder ensuring that...

Page 20: ...he handle on the outside of the door and secure by tightening the inner chrome knob to the protruding inner thread Wheels Fit the adjustable wheels to the top and bottom of the glass doors and ensure...

Page 21: ...a shower as a reference point IF YOUR DIAL DOES NOT CORROSPOND TO THE APPROPRIATE DEVICE Turn on your water to the shower and note which output the water exits from then turn off the water and swap ov...

Page 22: ...2 Electric Box Connections Connect the cables below to the corresponding devices on the shower Phono AUX CD MP3 Thermostatic Probe RJ11 Phone Connection Radio Aerial Fan Speaker Ozone o3 Top Light Tra...

Page 23: ...ith more than one person unless the shower is designed for this This product is not to be used for washing bathing animals Connection For Tray Column Lights Using the supplied extension lead please co...

Page 24: ...shower Make sure these are fitted in the correct position as they are only attached for transportation reasons only Water Inlet Connect a braided hose from the shower valve s centre feed to this open...

Page 25: ...ty and condensate thus the inspection be comes very difficult Now on the OUTSIDE of the shower inspect each joint factory seal hose clip and jet by walking from one side and going around to the back a...

Page 26: ...h Button 8 TUN Switch Between manual auto radio searching Button 9 Up Arrow Channel select up manual search up Button 10 Alarm Activate Alarm Button 11 M Set Steam Time Temperature When Radio is activ...

Page 27: ...contains many useful items such as is your parts warranty registered advice on cleaning servicing your shower cabin fault finding and many more items This is a MUST to read and not just HELP It saves...

Page 28: ...ack SP152 Standard shower head Sp166 Approximately 4 meters of U Style seals SP057 90 Degree Chrome Water Part Code Part Description SP300 Waste hose SP301 White insulated pipe SP221 Drain Hose SP183...

Page 29: ...used in any way shape or form with out written permission from Maclean International Ltd Images are NOT permitted to be saved printed or uploaded Violation of copyright laws are punishable by law All...

Reviews: