background image

 

www.insigniarange.com

 

Last Modified: 20/08/2020

 

 06 

We recommend a BAR pressure between 2.5 and 3.4 BAR. If 

you have a combi boiler system no problem should be 

experienced. If you have a gravity feed older type installation 

(hot water tank type usually less than 1 BAR) you will almost 

certainly need a pump. We cannot advise on which type of 

pump is used, location or design because all house plumbing 

layouts vary. This is a job for your installer/plumber. The end 

delivery however must fall within the scope above. 

 

Important Note

 Do not exceed 3.4 BAR pressure under any 

circumstances. Warranty is void if so as damage will occur.  If 

you have a combi supply, please use a pressure reducing valve 

if required to lower the BAR pressure to the shower.

 

 

Please Remember that this product is free standing and is 

 

designed to be pulled away from the wall.

 

The waste hose must be of a flexible type 

(1m flexible waste 

supplied).

 

The water supply pipes need to be at least 1 metre in length 

and must be that of a flexible braided type 

(not supplied).

 

DO NOT OVERTIGHTEN THE BRAIDED HOSES AS IT CAN CAUSE 

THE CONNECTION TO POP AFTER A FEW WEEKS OF USE.

 

Always fit easy to get to isolation taps on both hot and cold 

water supply (not supplied). Just like a dishwasher or washing 

machine, this product 

MUST

 be isolated when not in use.

 

You will require:

 

• 

Scissors

 

• 

Knife

 

• 

Spirit Level

 

• 

Tape Measure

 

• 

Philips Screwdriver

 

• 

Electric Drill

 

• 

Safety Gloves

 

• 

Safety Glasses

 

 

Pressure/Water Requirements

 

Tools Required

 

• 

RubberGum (supplied)

 

• 

Plumbers Mait (not supplied)

 

• 

Hot and cold isolation valves (not supplied)

 

• 

2 x Braided hoses (not supplied) 

Steam version 

 

requires 3.

 

Parts Required

 

STEAM VERSION

 

Voltage Rating      220

-

240AC

 

Frequency Rating     50Hz

 

Power Rating     3KW

 

NON

-

STEAM VERSION

 

Voltage Rating      100

-

240AC

 

Frequency Rating     50/60Hz

 

Power Rating     12v DC/1500 mA

 

Your electrical contractor should understand 

ALL 

legal 

requirements of connection before undertaking any work 

or installation. 

 

UNDER NO CIRCUMSTANCES UNDERTAKE THIS 

YOURSELF!!!

 

 

Note for electrician: This product comes with 13 amp plug

(s) fitted with an RCD unit 

(steam version only)

. We leave it 

this way for you to connect it your own way due to 

continued additions to current regulations.

 

1) Connect within current laws and IP directives.

 

2) (Preferred) Wire into isolated fused feed connecting 

directly to the house consumer/service box. 

 

Always use protection against electrical surge. Your shower 

should be treated the same as a home computer. A surge 

protector should eradicate the possibility of either the 

transformer or control panel being burnt out.

 

Electrical work needs to be signed off by a fully qualified 

operative by law. Failure to adhere to this will not only void 

your electrical warranty for your shower, but could void 

your house insurance too.

 

Electrical Requirements

 

Summary of Contents for 1100R ES Series

Page 1: ...f delivery Mon Fri 10 30 15 30 please have your supplier s details and your postcode to hand before calling Replacements Parts Inside of your warranty period contact www insigniarange co uk support Sp...

Page 2: ...your installation process easier than ever before Simply click the link below and watch the installation process Steam Shower Shower Cabin Please note this build video is for an Insignia Platinum Show...

Page 3: ...6 Box contents 7 Starting the installation 8 Accessory installation 17 Water valve connections 18 Control panel connections 19 Steam generator connections 21 Signing off your shower 22 Control panel i...

Page 4: ...this booklet with great care to ensure you get the best out of your build and have a shower that will last for many years to come Like everything in order to obtain a first class product that will ser...

Page 5: ...ng of a water softener Please note limescale build up may cause damage to your shower and will not be covered under warranty TIP 3 Installation These showers are designed to be free standing and movab...

Page 6: ...when not in use You will require Scissors Knife Spirit Level Tape Measure Philips Screwdriver Electric Drill Safety Gloves Safety Glasses Pressure Water Requirements Tools Required RubberGum supplied...

Page 7: ...rews 8 ST16 16mm Screws 28 ST20 or WN20 20mm Nut and Bolt or Wing Nut 12 PRC20 Glass Retaining Clips 4 AMI01 Jubilee Clip For steam version only 1 SW9 Small Washers 20 DB9 Drill Piece 1 VERY IMPORTANT...

Page 8: ...www insigniarange com Last Modified 20 08 2020 08 Twist to adjust Step 1 Level the Tray and connecting the waste...

Page 9: ...www insigniarange com Last Modified 20 08 2020 09 Step 2 Connecting framework Wider rail on top Narrow rail at the bottom 1 2 3 Internal View Framework securing clips x4...

Page 10: ...RubberGum to raised sections of the tray and remove backing paper Step 4 Fix framework to the tray PRESS FRAME DOWN FIRMLY ONTO THE RUBBERGUM Please Note 2nd Generation showers lower profile curve is...

Page 11: ...www insigniarange com Last Modified 20 08 2020 11 ST16 x12 Step 5 Connecting the back panels DO NOT SCREW BACK PANELS TO THE TRAY PRESS PANELS DOWN FIRMLY ON TO THE RUBBERGUM...

Page 12: ...st Modified 20 08 2020 12 Step 6 Column Connection NOTE Column features varies between models Rear View attach nuts and bolts or wing nuts from rear Below diagram shows the nut bolt install SW9 x 12 S...

Page 13: ...www insigniarange com Last Modified 20 08 2020 13 Step 7 Fixed Glass Connection ST16 x 4 PRC20 x 4...

Page 14: ...t Modified 20 08 2020 14 Step 8 Fitting the glass seals Fit seal inside the shower between the glass and framework Step 9 Fitting the door stops Internal View Top Rail Internal View Bottom Rail ST10 x...

Page 15: ...www insigniarange com Last Modified 20 08 2020 15 Step 10 Attaching the Roof ST16 x6 Screw from the rear Step 11 Fit door handles seals and magnets...

Page 16: ...fied 20 08 2020 16 Step 12 Fit top door wheels x 4 Slide cover off Door Tighten to secure wheels into door runners DO NOT OVERTIGHTEN Step 13 Fit bottom door wheels x 4 Slide cover off Door Step 14 Fi...

Page 17: ...www insigniarange com Last Modified 20 08 2020 17 Step 15 Accessory Installation Slide cover off Slide cover off...

Page 18: ...m Last Modified 20 08 2020 18 Monsoon Head Jets Cold Water Inlet Hot Water Inlet Step 16 Valve Water Connections Hand Shower 2 x Washers located on the back of the valve Connection for steam generator...

Page 19: ...www insigniarange com Last Modified 20 08 2020 19 Step 17 Button Control Panel Connections Power Supply Antenna Speaker Speaker Roof Light Essential Steam Version Essential Shower Cabin Version...

Page 20: ...ww insigniarange com Last Modified 20 08 2020 20 Step 17 Touch Sensitive Control Panel Connections Power Supply Antenna Speaker Speaker Roof Light Steam Shower Version Shower Cabin Version Power Suppl...

Page 21: ...ect a braided hose not supplied from the shower valve s centre feed to this opening 2 Drain Connect the grey rubber hose from the steam generators drain opening to the nozzle on the shower waste as sh...

Page 22: ...t aim the hand shower directly at the joints of your shower as this does not fall under normal showering conditions However due to Insignia s unique design of the shower tray water will only leak back...

Page 23: ...e steam session Maximum time is 60 minutes Use the and buttons to increase or decrease time temperature Button 7 LIGHTS Press to pause the lights on a specific colour Press again to turn the lights of...

Page 24: ...to denote your successful connection Button 7 Inactive Button 8 Press once to activate the lights The colours will scroll until you press the light button again This will pause on your specified colou...

Page 25: ...t be accidentally activated Other buttons will remain functional whilst in this state of lock mode Button 5 Music Press once for FM Radio and press twice for Bluetooth For tuning radio stations or co...

Page 26: ...etooth Step 1 To tune your radio channels firstly press the music function button which looks like a musical note Tuning your radio channels Step 1 To connect a device via Bluetooth press the music fu...

Page 27: ...lume Press up or down to increase or decrease the volume in the cabin Also use this when manually searching for a radio station Button 4 5 Skip button Press to skip radio station on the radio setting...

Page 28: ...sion only SP217 Button Essential Control Panel steam version only SP217B Touch Sensitive Insignia Control Panel steam version only SP152 Hand Shower SP194 Fixed Glass Seals 12mm SP215 Light diffuser S...

Page 29: ...e use 8 If you have any underlying health conditions which you feel could be aggravated by using a steam room consult your GP before use 9 If you begin to have any issues with your health after using...

Page 30: ...ee a small C to the right of the display The large number in the middle of the display can be changed by pressing the arrows 4 The maximum temperature you can reach is 60 C The average temperature in...

Page 31: ...www insigniarange com Last Modified 20 08 2020 31 Bathroom Electrical Zones...

Page 32: ...oom goes past zones 0 1 and 2 portable electrical appliances can be utilised if their cord length doesn t allow them to be used in zone 2 For example a hairdryer can be used in the outside zones provi...

Page 33: ...mmon crossed out wheelie bin label We accept returns of all products carrying the Insignia brand All other products are either considered outside the scope of WEEE or Insignia is not technically the p...

Page 34: ...www insigniarange com Last Modified 20 08 2020 34...

Reviews: