3.4.2

 

Supply Currents 

Phase of operation

 

Current draw (max)

 

Standby 

200mA 

Running (RMS) 

1 A 

Peak 

2.5 A 

3.4.3

 

Power Supply Guidance 

The NV9 Spectral requires a stable 12 V DC / 3 A power supply. Please check the 
power requirements of the host machine and other peripherals to dimension a 
suitable power environment for the machine setup. 

Caution! 

Power must always be connected. 

TDK Lambda manufactures suitable power supplies. Please see table below for 
further details. 

Power Supply Unit

 

Specification

 

RS Stock Code

 

Farnell Stock Code

 

TDK Lambda SWS50-12 

+12 V DC / 4.3 A

466-5869

1184645 

TDK Lambda SWS75-12 

+12 V DC / 6.3 A

466-5904

1184648 

TDK Lambda SWS150-24 

+24 V DC / 6.3 A

466-5982

1184653 

3.5

 

Interface Logic Levels 

Interface Logic Levels 

Logic Low 

Logic High 

Inputs 

0V to +0.5V 

+3.7V to +12V

Outputs with 2K2

Ω pull

-up resistor 

+0.6V

Pull-up voltage of host interface 

Maximum Current Sink 

50mA per Output 

Summary of Contents for NV9 Spectral

Page 1: ...Doc PA02093 Version 1...

Page 2: ...5 1 1 Bezel flash counts 9 2 7 BEZEL OPTIONS 10 2 8 CASHBOX OPTIONS 10 3 TECHNICAL DATA 11 3 1 DIMENSIONS 11 3 2 WEIGHT 11 3 3 ENVIRONMENTAL REQUIREMENTS 11 3 4 POWER REQUIREMENTS 11 3 4 1 Supply Volt...

Page 3: ...21 6 2 SOFTWARE DOWNLOADS 21 6 3 DRIVERS 21 6 4 DATASET FIRMWARE PROGRAMMING 21 6 4 1 Validator Manager 21 6 4 1 1 General Description 21 6 4 1 2 System Requirements 21 6 4 1 3 Hardware Setup 22 6 4...

Page 4: ...commencing on the date of purchase from Innovative Technology Ltd or its Authorized Reseller and extending for the length of time stipulated by Innovative Technology Ltd A list of Innovative Technolog...

Page 5: ...tive Technology Ltd product however caused 1 5 Product Safety Information Throughout this user manual attention should be drawn to key safety points when using or maintaining the product These safety...

Page 6: ...euer Aviso de seguridad Aseg rese de que la alimentaci n est desconectada y de que toda la energ a est tica es descargada antes de manipular este producto Conecte a tierra la chapa base de la manera q...

Page 7: ...nknote validator can be mounted horizontally or vertically with cashbox and bezel options to suit all applications and a micro SD card for data logging 2 2 Key Features Micro SD card slot for data log...

Page 8: ...6 pin socket is hidden within the housing assembly the housing assembly will need to be opened before accessing the socket The initial step will be to push the release catch and thereafter to lift the...

Page 9: ...ay connector 2 5 Configuration and Fault Codes The configuration button has multiple functions please see section 2 5 1 The common function of the configuration button is to switch the protocol to SSP...

Page 10: ...SHORT flashes 1 2 3 4 5 1 Note Path Open Note Path Jam Unit Not Initialized Sensor Covered 2 Cash Box Removed Cash Box Jam 3 Firmware Checksum Interface Checksum EEPROM Checksum Dataset Checksum Note...

Page 11: ...USB Vertical Up Bezel 82mm http innovative technology com shop bezels nv9 vertical up snout bezel detail PA00191 NV9 USB Vertical Down Snout Bezel 82mm http innovative technology com shop bezels nv9...

Page 12: ...dator 1 05 KG Bezel standard 0 10 KG Cashbox slide on 0 57 KG Combined 1 72 KG 3 3 Environmental Requirements Environment Minimum Maximum Temperature 5 C 37 4 F 50 C 122 F Humidity 5 95 Non condensing...

Page 13: ...itable power environment for the machine setup Caution Power must always be connected TDK Lambda manufactures suitable power supplies Please see table below for further details Power Supply Unit Speci...

Page 14: ...her power consumption Refer to 3 4 for full power requirement details of the NV9 Spectral Caution A weak power supply causes malfunctioning 4 2 Software Compatibility 4 2 1 Interface protocols When us...

Page 15: ...ng the red bezel latches down on both sides of the validator downwards and sliding the bezel away from the bezel latches ensure the bezel has slid forward enough to clear the steep part of the latch 1...

Page 16: ...fitting the bezel onto the validator ensure that it sits in place such that it is ready to push down into place then push down the bezel 2 Sliding the bezel into place Once the bezel is in place with...

Page 17: ...Back to Contents Copyright Innovative Technology Ltd 2018 Doc PA02093 Version 1 Page 16 of 26 4 4 Cashbox Mounting 4 4 1 Cashbox Removal To remove the cashbox push the release catch away from the unit...

Page 18: ...s to bad note acceptance and other performance degradation Please refer to the section below for comprehensive cleaning instructions 5 2 2 Cleaning the validator Do not use solvent based cleaners such...

Page 19: ...ge the locking clip must be removed Ensure that the cashbox has been removed initially to gain access to the locking pin on the underside of the main housing assembly On the underside of the main hous...

Page 20: ...es attached to the lozenge pushing the lozenge latch both Left and right forwards will release the Lozenge out of the housing assembly 3 Cleaning the lozenge A lint free cloth dampened with water and...

Page 21: ...he lozenge into place When placing the lozenge back into the housing assembly ensure that the lozenge is secured into the grooves of the rear side of the housing assembly then simply push down the loz...

Page 22: ...egistered email address once all contact details have been successfully submitted 6 3 Drivers The ITL drivers allow the validators to connect to a compatible Windows device If connecting via an IF17 t...

Page 23: ...Switching to Programming Mode SSP Before programming via the Validator Manager software the NV9 Spectral needs to be switched to its programming mode SSP interface Please refer to section 6 for the p...

Page 24: ...to flash signaling the update has begun Caution Interrupting the download process can result in the unit entering a non functional state once the process has started it cannot be halted When completed...

Page 25: ...NV9 Spectral Quick Start Guide Back to Contents Copyright Innovative Technology Ltd 2018 Doc PA02093 Version 1 Page 24 of 26 7 APPENDIX 7 1 Cable Drawings 7 1 1 CN214...

Page 26: ...NV9 Spectral Quick Start Guide Back to Contents Copyright Innovative Technology Ltd 2018 Doc PA02093 Version 1 Page 25 of 26 7 1 2 CN174...

Page 27: ...NV9 Spectral Quick Start Guide Back to Contents Copyright Innovative Technology Ltd 2018 Doc PA02093 Version 1 Page 26 of 26 7 1 3 CN392...

Reviews: