Innovation First 101-6883 Installation Instructions Download Page 3

Hole for "Coupling" Brackets

Hole for "Coupling" Brackets

If there are multiple servers stacked vertically, follow step 3 below.

Step 3

Bracket Coupling:

 Install 12-24 Slotted Hex Bolts at the location shown below to 

"Couple" the brackets. Bolts may be installed from the top or bottom.

Step 4

Equipment Installation:

 This 2Post Conversion kit creates a standard depth 4 Post 

rack. Equipment designed for square holes will typically install without issues. Use 

the provided cage nuts and screws from the Bracket Hardware Kit when threaded 

holes are required.

For equipment compatibility information, refer to the following sites:

www.RackSolutions.com             (Dell equipment)

www.RackSolutions.com/hp        (HP-compaq equipment)

www.RackSolutions.com/ibm      (IBM equipment)

Installation Instructions

Page 3

Reviews: