17
EN
EAP-QUADRAT-10 / Version 170511 / www.innotech.at
15
COPY TEMPLATE
ACCEPTANCE REPORT
DOCUMENTATION OF FASTENINGS/PHOTO-DOCUMENTATION
PRODUCT:
Pcs.
Year/Serial Nr.:
(Type designation EAP/Attachment point)
Installation substructure:
(
e.g solid concrete grade: C20/25; wood, rafter dimensions; for sheet roofs: roof manufacturer, profile, material, sheet thickness,
etc.)
Date:
Location:
Anchor
type:
BEF/adhesive/
designation
Seat
depth:
[mm]
Drill Ø:
[mm]
Tigh-
tening
torque:
Photos:
(save directory)
mm
mm
Nm
mm
mm
Nm
The undersigned installation company ensures the correctness of their work (edge spacing, inspection of the substructure, proper
cleaning of drill holes, observation of hardening times, working temperature and screw manufacturer guidelines, etc.). The customer
accepts the services of the contractor. The instruction manuals, fastening documentations/ photo-documentations, and inspection
reports were given to the customer (building owner) and are to be made available to the user. At the point of access to the fall
prevention system, the positions of the anchor points are to be documented by the building owner by means of plans (e.g. sketches
of the rooftop).
The
contractor, a qualified professional who is familiar with the fall prevention system, confirms that the installation
was performed correctly, up to the latest technologigal standards and according to the manufacturer's instruction
manual. The reliability and safety is confirmed by the contracting company.
Delivery of:
(e.g.: Personal protective equipment PPE, fall arrest devices HSG, storage cabinet, etc.)
Pcs.
Pcs.
Pcs.
Pcs.
Incorporated into existing lightning protection system?
YES NO
Comments:
Name:
ACCEPTANCE REPORT NR.
____
(PART 2/2)
E A P - Q U A D R A T - 1 0
Customer
Date, company seal, signature
Date, company seal, signature
Inspection: Contractor (Qualified professional
familiar with the fall prevention system)