![Innotech BARRIER-ATTIKA Instruction Manual Download Page 43](http://html1.mh-extra.com/html/innotech/barrier-attika/barrier-attika_instruction-manual_2063077043.webp)
43
EN
BARRIER-ATTIKA/190611/www.innotech.at
FASTENER & PHOTO DOCUMENTATION
INSTALLATION SUBSTRUCTURE
________________________________________________________
(e.g.: solid concrete quality: C20/25)
Date:
Location:
Dowel type:
Fastening/
adhesive type:
Setting
depth:
[mm]
Drill bit
Ø:
[mm]
Tightening
torque:
Photos:
(storage
location)
mm
mm
Nm
mm
mm
Nm
mm
mm
Nm
The installation company who signs warrants correct workmanship (edge spacing, inspection of the substructure, proper cleaning of
bores, compliance with curing times and processing temperature, compliance with the dowel manufacturer's guidelines, etc.)
The client accepts the work performed by the contractor. The user instructions, documentation of the fastenings, and photo
documentation and test sheets have been transferred to the client (building owner) and have been made available to the user.
When accessing the fall protection system, the building owner must document the positions of the side protection system by means
of diagrams (e.g. top view of the roof).
The expert installer familiar with the fall protection system confirms that the installation work has been executed
correctly, as per the state of the art, and in accordance with the manufacturer's instructions for use. The technical
safety reliability is confirmed by the installation company.
Comments:
_________________________________________________________
Included in lightning protection system?
Yes
No
Name:
Client
Fitter, anchorage points
Date, company stamp, signature
Date, company stamp, signature
Fitter of side protection system
Date, company stamp, signature
17
ACCEPTANCE LOG
15
COPY TEMPLATE
ACCEPTANCE LOG
ACCEPTANCE LOG NO. ____
(PART 2/2)
S I D E P R O T E C T I O N S Y S T E M
COPY
TEMPLATE
COPY
TEMPLATE
COPY
TEMPLATE
COPY
TEMPLATE