background image

4

Installation

1. Connect the active RF coaxial cable to the “CABLE” connector.

2. Coaxial cable screen shield needs to be connected to the earth at the

building entrance per ANSI/NFPA 70, the National Electrical Code (NEC), in
particular Section 820.93, Grounding of Outer Conductive Shield of a Coaxial 
Cable or in accordance with local regulation. For additional grounding, it is 
strongly recommended that a grounding cable to be connected to the ground 
screw terminal as shown in the diagram. 

3. Connect any standard analog telephone or fax machine to ESBCs “PHONE” 

connector, labeled 1-4.

4. Optionally, connect LAN port 2, 3, or 4 to corporate LAN which has IP Phone  

or IP PBX. 

5. Optionally, connect T1/E1 port 1 and/or 2 to a corporate TDM PBX. See T1/E1 

cable wiring pin-out in Appendix B.

6. Connect included AC power cable to the electrical outlet and its cable to the 

ESBC’s “12V DC” connector.

7. Secure AC power cord in the plastic cable harness for power cable in the back 

of the unit.

8. Open the battery compartment and insert the battery completely until it is 

secured properly with the plastic latch. Put the cover back in place. 

Summary of Contents for InnoMedia ESBC 9578-4B

Page 1: ...1 InnoMedia ESBC 9578 4B Quick Install Guide www innomedia com...

Page 2: ...2 Package Contents 2 CAUTION 2 Installation 3 Wall Mounting Instructions 5 Troubleshooting 6 Appendix A LED Status Summary 7 Appendix B T1E1 Wiring Diagram 8 Specifications 8 Federal Communication Com...

Page 3: ...suitable for wide deployment by MSOs addressing SIP PBX interoperability Package Contents The InnoMedia ESBC 9578 4B comes with the following items 1 ESBC 1 RJ 45 Cable 2 RJ 11 Phone Cables 1 AC DC Po...

Page 4: ...nal as shown in the diagram 3 Connect any standard analog telephone or fax machine to ESBCs PHONE connector labeled 1 4 4 Optionally connect LAN port 2 3 or 4 to corporate LAN which has IP Phone or IP...

Page 5: ...you have performed step 5 wait for T1 E1 LED on front of ESBC to be steady green 11 At this point you have completed the ESBC installation You will hear the dial tone when you pick up the handset of...

Page 6: ...etal screw in each hole Leave the screw heads 1 4 to 3 8 inch away from the wall 3 Position the ESBC with the ports at the top 4 Place the unit above the screws and lower it so the screw heads are ins...

Page 7: ...e solidly lit the cable modem is working properly Try restarting the computer so that it could reestablish a connection with the cable modem 2 Power cycle the ESBC by switching the power to the Off po...

Page 8: ...dule is searching for downstream frequency BlinkingGreensimultaneous with SEND LED The cable modem module is currently upgrading Off The cable modem module is not locked to downstream frequency SEND S...

Page 9: ...ports with PRI or CAS signaling User Data Interface 4 10 100 1000 BaseT Ethernet RJ 45 RF Input Level 15dBmV 15dBmV Frequency Range Upstream DOCSIS 5 65Mhz Downstream DOCSIS 88 860MHz UPS Rating 12V...

Page 10: ...the receiver is connected Consult the dealer or an experienced radio TV technician for help This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 T...

Reviews: