![INNO View 950M User Manual Download Page 45](http://html1.mh-extra.com/html/inno/view-950m/view-950m_user-manual_2062291045.webp)
View950M Multi-Scan
INNO Instrument Inc. Page 45 of 55
<
Connection >
<
Progress >
<
Completion >
3.
OSL – Load Calibration
- When the short calibration is completed, the screen switches to the
Load connection.
- Remove the short cal kit connected to the real port and connect
the load.
- After connecting the load cal-kit to the port, click the Load Icon as
shown on the left.
- Load calibration is performed as below.
<
Connection >
<
Progress >
<
Completion >
4.
Current Port Calibration completion
- After completing Open, Short, and Load, the corresponding icon
on the screen will change to
, and the 'Apply' button will appear
on the bottom button array.
- Click the 'Apply' button to apply the actual calibration.
Summary of Contents for View 950M
Page 1: ...Revision 1 0...
Page 4: ...View950M Multi Scan INNO Instrument Inc Page 4 of 55 1 GENERAL INFORMATION...
Page 7: ...View950M Multi Scan INNO Instrument Inc Page 7 of 55...
Page 8: ...View950M Multi Scan INNO Instrument Inc Page 8 of 55 2 INSTRUMENT OVERVIEW...
Page 12: ...View950M Multi Scan INNO Instrument Inc Page 12 of 55 3 MENU DESCRIPTIONS...
Page 42: ...View950M Multi Scan INNO Instrument Inc Page 42 of 55 4 TEST METHOD...
Page 52: ...View950M Multi Scan INNO Instrument Inc Page 52 of 55 5 WARRANTY INFORMATION...
Page 55: ...www innoinstrument com...