4.2.2  A65+ 

 

The protective covers protect against direct electrical contact. They should be removed in order to 
make the connections and replaced once the connections have been made. 

Make the connection as shown in the following figure, installing current transformers in each phase. 

 

 

Consult the section on 

“Current Transformers” 

for further information on these 

transformers 

 

 

The wattmeter must be installed upstream from the installation that consumes 
and generates the power to be managed. 

 

 

 

Summary of Contents for INGEREV SMART DLM

Page 1: ...INGEREV SMART DLM INGEREV SMART DLM PRO Installation and configuration manual Manual de instalaci n y configuraci n Manuel d installation et configuration Manuale d installazione e configurazione...

Page 2: ...are 6 3 1 2 Hardware SMART DLM Kit 6 3 2 Installation standard SMART DLM 6 4 Wattmeter 7 4 1 Installation 7 4 2 Connection 7 4 2 1 A65 8 4 2 2 A65 9 Power supply to wattmeter A65 10 Current transforme...

Page 3: ...ns personnel who at least meet the requirements of all safety standards rules regulations and legislation applicable to the equipment installation and operating tasks for all the elements in the insta...

Page 4: ...icable legislation on safety when working with electricity 1 5 Treatment of waste Communication accessories use components that are harmful to the environment electronic boards batteries etc At the en...

Page 5: ...d to the Charging Points The system is multi master so that any of the units can assume group management with no special equipment required The management is adaptive amp by amp and in real time based...

Page 6: ...Kit The SMART DLM kit is always three phase There are three different versions depending on the installation power at the meter point and the charging point with which communication is to be establish...

Page 7: ...phases current transformers are required Through an RS 485 serial communication between the INGEREV charging point and the wattmeter the charging point obtains the wattmeter readings in order to auto...

Page 8: ...ake the connections and replaced once the connections have been made Make the connections as shown in the following figures Single phase installation A bridge should be made between points 1 and 4 of...

Page 9: ...the connections and replaced once the connections have been made Make the connection as shown in the following figure installing current transformers in each phase Consult the section on Current Tran...

Page 10: ...y current of the current transformer The rated current of the wattmeter to which the transformer secondary is to be connected is In 5 A and the maximum current of the same is Imax 10 A In order to ens...

Page 11: ...wer value that is as close as possible to the calculated power while the said normalised power must always be greater than the calculated power For correct operation the following relationship must be...

Page 12: ...nd RS485 bus The 120 end of line resistor should be connected between connection points 41 and 42 which also coincide with the RS485 bus terminals A65 A65 The RS 485 communication should be made as in...

Page 13: ...ault Once you have entered the code press the joystick once to accept 4 This gives you access to the password configuration screen CNG PASS We would advise you not to change the password and to move t...

Page 14: ...er ratio is 600 8 Use the joystick to scroll to the ADDRESS node number screen Press the joystick once PRG will appear at the bottom of the display Move the joystick in any of the 4 directions to indi...

Page 15: ...INGEREV SMART DLM Ingeteam ABW2012IQM01_A 15 EN ES FR IT 10 Move to the END screen Press the joystick once to exit the main screen 11 Use the selector switch to return to the locked position...

Page 16: ...rnal wattmeter and the INGEREV FUSION charging points you need to add an RS485 board which connects to the control board located on the charging point door This RS485 board is included in the SMART DL...

Page 17: ...e the pull up and pull down resistors for devices with a Standard uncertainty threshold The RS485 board must have one of the following two configurations The three poles in position ON Poles 1 and 2 i...

Page 18: ...M 18 ABW2012IQM01_A 5 1 4 RS485 wiring The RS485 connector pins correspond to these signals Pin Signal 1 RS 485 B 2 RS 485 A 3 Protection screen optional 4 GND Each pin is the terminal type to make th...

Page 19: ...PID To communicate the external wattmeter with the INGEREV RAPID charging points you need to use the free RS485 connection on the unit This connector is shown in green below The RS485 connector pins c...

Page 20: ...1_A 6 Configuring the Smart DLM The configuration is made through the INGEREV WEB Manager interface for the INGEREV units For the software configuration of this system consult the instructions on the...

Page 21: ...n 25 3 1 1 Software 25 3 1 2 Hardware Kit SMART DLM 25 3 2 Instalaci n SMART DLM tipo 25 4 Vat metro 26 4 1 Instalaci n 26 4 2 Conexi n 26 4 2 1 A65 27 4 2 2 A65 28 Alimentaci n del vat metro A65 29 T...

Page 22: ...de personal cualificado a la que se refiere este manual ser como m nimo aquella que satisfaga todas las normas reglamentos y leyes en materia de seguridad aplicables a los trabajos de instalaci n y o...

Page 23: ...n aplicable en materia de seguridad para el trabajo el ctrico 1 5 Tratamiento de residuos Los accesorios de comunicaciones utilizan componentes nocivos para el medio ambiente tarjetas electr nicas bat...

Page 24: ...de Recarga El sistema es multi maestro por lo que cualquiera de los equipos puede asumir la gesti n del grupo no siendo necesario equipos especiales La gesti n es adaptativa amperio a amperio y en tie...

Page 25: ...2 Hardware Kit SMART DLM El Kit SMART DLM es siempre trif sico Existen tres versiones distintas seg n la potencia de la instalaci n en el punto de medida y el punto de recarga con el que se vaya a co...

Page 26: ...transformadores de corriente A trav s de una comunicaci n serie RS 485 entre el punto de recarga INGEREV y el vat metro el punto de recarga obtiene los valores medidos por el vat metro con el objetiv...

Page 27: ...iones se deber n quitar y una vez conectado volver a instalarlas Efectuar la conexi n como muestran las siguientes figuras Instalaci n monof sica Se debe conectar un puente entre los puntos 1 y 4 del...

Page 28: ...onectado volver a instalarlas Efectuar la conexi n como muestra la siguiente figura instalando transformadores de corriente en cada una de las fases Consultar la secci n Transformadores de intensidad...

Page 29: ...dario A Valor de corriente nominal en el secundario del transformador de intensidad La corriente nominal del vat metro al que se va a conectar el secundario del transformador es In 5 A y la corriente...

Page 30: ...ada m s cercana posible a la calculada siendo siempre dicha potencia normalizada superior a la calculada Para el correcto funcionamiento se debe cumplir con la siguiente relaci n En caso de no cumplir...

Page 31: ...bus RS485 Se debe conectar la resistencia de fin de l nea de 120 entre los puntos de conexi n 41 y 42 que coinciden tambi n con los terminales del bus RS485 A65 A65 La comunicaci n v a RS 485 se reali...

Page 32: ...ida la clave pulsar una vez el joystick para aceptar 4 Al aceptar se accede a la pantalla de configuraci n de la contrase a CNG PASS Se recomienda no modificar el valor y desplazar el joystick hacia l...

Page 33: ...laci n de transformaci n es 600 8 Avanzar hasta la pantalla de n mero de nodo ADDRESS mediante el joystick Presionar el joystick una vez aparecer en la parte inferior del display la indicaci n PRG Des...

Page 34: ...eteam INGEREV SMART DLM 34 ABW2012IQM01_A 10 Avanzar hasta la pantalla END Presionar el joystick una vez para salir a la pantalla principal 11 Volver a elegir la posici n de bloqueo mediante el select...

Page 35: ...arga INGEREV FUSION es necesario a adir al mismo una tarjeta RS485 que se conecta sobre la tarjeta de control situada en la puerta del punto de recarga Esta tarjeta RS485 est incluida en el Kit SMART...

Page 36: ...ias pull up y pull down necesarias para dispositivos con umbral de incertidumbre Standard La tarjeta RS485 deber llevar una de estas dos configuraciones Los tres polos en la posici n ON Los polos 1 y...

Page 37: ...2IQM01_A 37 EN ES FR IT 5 1 4 Cableado RS485 Los pines del conector RS485 se corresponden con estas se ales Pin Se al 1 RS 485 B 2 RS 485 A 3 Pantalla de protecci n opcional 4 GND Cada pin es de tipo...

Page 38: ...nicar el vat metro externo con los puntos de recarga INGEREV RAPID debe usarse la conexi n RS485 libre en el equipo A continuaci n se destaca dicho conector en verde Los pines del conector RS485 se co...

Page 39: ...ES FR IT 6 Configuraci n Smart DLM La configuraci n se realiza mediante el interfaz INGEREV WEB Manager de los equipos INGEREV Para la configuraci n software de este sistema consultar las instruccion...

Page 40: ...tion 44 3 1 1 Logiciel 44 3 1 2 Hardware Kit SMART DLM 44 3 2 Installation SMART DLM type 44 4 Wattm tre 45 4 1 Installation 45 4 2 Raccordement 45 4 2 1 A65 46 4 2 2 A65 47 Alimentation du wattm tre...

Page 41: ...on de personnel qualifi laquelle se r f re ce manuel sera attribu e au minimum toute personne satisfaisant aux normes r glements et lois applicables en mati re de s curit aux travaux d installation et...

Page 42: ...gislation applicable en mati re de s curit aux travaux d installation lectrique 1 5 Traitement des d chets Les accessoires de communication utilisent des composants nocifs pour l environnement cartes...

Page 43: ...connect s aux Points de Recharge Le syst me tant multima tre n importe lequel des quipements peut assumer la gestion du groupe sans n cessit d quipements sp ciaux La gestion est adaptative amp re amp...

Page 44: ...Hardware Kit SMART DLM Le kit SMART DLM est toujours triphas Il en existe trois versions diff rentes suivant la puissance de l installation au point de mesure et le point de recharge avec lequel on va...

Page 45: ...transformateurs de courant n cessaires Le point de recharge obtient les valeurs mesur es par le wattm tre travers une communication s rie RS 485 entre le point de recharge INGEREV et le wattm tre afin...

Page 46: ...s enlever et les remonter une fois les raccordements effectu s Effectuer le raccordement comme indiqu sur les figures suivantes Installation monophas e Il faudra connecter un pont entre les points 1 e...

Page 47: ...lever et les remonter une fois les raccordements effectu s Effectuer le raccordement comme indiqu sur la figure suivante en installant des transformateurs de courant sur chaque phase Se reporter la se...

Page 48: ...ondaire du transformateur de courant Le courant nominal du wattm tre auquel va tre raccord le secondaire du transformateur est In 5 A et son courant maximal Imax 10 A Pour s assurer de la pr cision de...

Page 49: ...la puissance normalis e la plus proche possible de celle calcul e cette puissance normalis e tant toujours sup rieure celle calcul e Pour le fonctionnement correct le rapport suivant devra tre respect...

Page 50: ...S485 On connectera la r sistance de fin de ligne de 120 entre les points de connexion 41 et 42 qui co ncident aussi avec les terminaux du bus RS485 A65 A65 La communication via RS 485 s effectue en su...

Page 51: ...le code introduit appuyez une fois sur le joystick pour accepter 4 En acceptant on acc de l cran de configuration du mot de passe CNG PASS Nous conseillons de ne pas modifier la valeur et de d placer...

Page 52: ...de 600 8 Avancez jusqu l cran du num ro de n ud ADDRESS avec le joystick Appuyez une fois sur le joystick l indication PRG s affichera dans la partie inf rieure de l cran D placez le joystick dans l...

Page 53: ...INGEREV SMART DLM Ingeteam ABW2012IQM01_A 53 EN ES FR IT 10 Avancez jusqu l cran END Appuyez une fois sur le joystick pour retourner l cran principal 11 Remettre le s lecteur en position de blocage...

Page 54: ...NGEREV FUSION il est n cessaire d y ajouter une carte RS485 qui se connecte sur la carte lectronique de contr le situ e sur la porte du point de recharge Cette carte RS485 est fournie dans le kit SMAR...

Page 55: ...n n cessaires pour les dispositifs ayant un seuil d incertitude standard On choisira l une des 2 options suivantes pour la configuration de la carte RS485 Avec les trois p les en position ON Avec les...

Page 56: ...ABW2012IQM01_A 5 1 4 C blage RS485 Les broches du connecteur RS 485 sont affect es ces signaux Broche Signal 1 RS 485 B 2 RS 485 A 3 cran de protection optionnel 4 GND Chaque broche est de type borne...

Page 57: ...wattm tre externe puisse communiquer avec les points de recharge INGEREV RAPID on utilisera la connexion RS485 libre de l quipement Sur la figure ce connecteur est indiqu en vert Les broches du conne...

Page 58: ...Configuration Smart DLM La configuration s effectue travers l interface INGEREV WEB Manager des quipements INGEREV Pour la configuration logicielle de ce syst me veuillez consulter les instructions s...

Page 59: ...e 63 3 1 1 Software 63 3 1 2 Hardware Kit SMART DLM 63 3 2 Installazione tipo SMART DLM 63 4 Wattmetro 64 4 1 Installazione 64 4 2 Connessione 64 4 2 1 A65 65 4 2 2 A65 66 Alimentazione del wattmetro...

Page 60: ...personale qualificato di cui al presente manuale saranno come minimo quelle che soddisfano tutte le norme i regolamenti e le leggi sulla sicurezza applicabili all installazione e al funzionamento di...

Page 61: ...bili in materia di sicurezza per i lavori elettrici 1 5 Trattamento dei rifiuti Gli accessori per le comunicazioni utilizzano componenti dannosi per l ambiente schede elettroniche batterie o pile ecc...

Page 62: ...ricarica Il sistema multi master quindi tutte le apparecchiature possono assumere la gestione del gruppo senza richiedere apparecchiature speciali La gestione adattativa da amp ad amp e in tempo real...

Page 63: ...INGEREV RAPID ST 3 1 2 Hardware Kit SMART DLM Il Kit SMART DLM sempre trifase Esistono tre versioni diverse a seconda della potenza dell impianto nel punto di misurazione e del punto di ricarica con...

Page 64: ...ssari trasformatori di corrente Attraverso la comunicazione seriale RS 485 tra il punto di ricarica INGEREV e il wattmetro il punto di ricarica riceve i valori misurati dal wattmetro al fine di regola...

Page 65: ...onnessioni necessario rimuoverli e una volta eseguita la connessione reinstallarli Effettuare la connessione come indicato nelle figure seguenti Installazione monofase Si deve collegare un ponte tra i...

Page 66: ...rli e una volta eseguita la connessione reinstallarli Effettuare la connessione come indicato nella figura seguente installando i trasformatori di corrente in ciascuna delle fasi Consultare la sezione...

Page 67: ...ente nominale del secondario del trasformatore di corrente La corrente nominale del wattmetro a cui deve essere collegato il secondario del trasformatore In 5 A e la corrente massima dello stesso Imax...

Page 68: ...otenza normalizzata pi vicina a quella calcolata detta potenza normalizzata essendo sempre maggiore di quella calcolata Per un corretto funzionamento deve essere soddisfatto il seguente rapporto Se qu...

Page 69: ...s RS485 La resistenza di fine linea da 120 deve essere collegata tra i punti di connessione 41 e 42 che coincidono anche con i terminali del bus RS485 A65 A65 La comunicazione tramite RS 485 si ottien...

Page 70: ...password premere una volta il joystick per confermare 4 Dopo la conferma si accede alla schermata di configurazione della password CNG PASS Si consiglia di non modificare il valore e spostare il joys...

Page 71: ...ndare alla schermata del numero di nodo ADDRESS utilizzando il joystick Premere una volta il joystick l indicazione PRG apparir nella parte inferiore del display Spostare il joystick in una delle 4 di...

Page 72: ...geteam INGEREV SMART DLM 72 ABW2012IQM01_A 10 Andare alla schermata END Premere una volta il joystick per uscire dalla schermata principale 11 Ritornare alla posizione di blocco per mezzo del selettor...

Page 73: ...di ricarica INGEREV FUSION necessario aggiungervi una scheda RS485 che si collega alla scheda di controllo situata sulla porta del punto di ricarica Questa scheda RS485 inclusa nel Kit SMART DLM per...

Page 74: ...ull up e pull down necessarie per dispositivi con soglia di incertezza Standard La scheda RS485 dovr avere una di queste due configurazioni I tre poli nella posizione ON I poli 1 e 2 nella posizione O...

Page 75: ...01_A 75 EN ES FR IT 5 1 4 Cablaggio RS485 I pin del connettore RS485 corrispondono ai seguenti segnali Pin Segnale 1 RS 485 B 2 RS 485 A 3 Schermo di protezione opzionale 4 GND Ciascun pin di tipo ter...

Page 76: ...esterno possa comunicare con i punti di ricarica INGEREV RAPID si deve utilizzare sull apparecchiatura la connessione RS485 libera Di seguito evidenziato tale connettore in verde I pin del connettore...

Page 77: ...IT 6 Configurazione Smart DLM La configurazione si effettua tramite l interfaccia INGEREV WEB Manager dell apparecchiatura INGEREV Per la configurazione del software di questo sistema consultare le is...