background image

Kit de autoconsumo instantáneo para 
INGECON SUN Lite
Instant self-consumption kit for  
INGECON SUN Lite

W

A

B

C

D

E

RS-485

E

F

G

Castellano

English

A. Red.

B.  Interruptor de Control de Potencia (ICP).

C. Diferencial.

D. Vatímetro 

A65.

E. Cargas.

F. 

INGECON SUN Lite.

G. Paneles 

solares.

A. Grid.

B.  Circuit breaker switch.

C.  Residual current device.

D. Wattmeter 

A65.

E. Loads.

F. 

INGECON SUN Lite.

G. Solar 

panels.

AAY2002IKH01_A 
10/2013

Ingeteam Power Technology, S.A. 
Energy

 

Avda. Ciudad de la Innovación, 13 
31621 SARRIGUREN (Navarra) - Spain 
 

 
 
Tel.: +34 948 28 80 00 
Fax: +34 948 28 80 01 
e-mail: [email protected]

W

Castellano

Conexión del vatímetro

Todas las conexiones se deberán realizar sin tensión.

El vatímetro se debe instalar sobre carril DIN. 

Es importante instalar el vatímetro en el punto de conexión de la vivienda 

después del Interruptor de Control de Potencia (ICP) y del diferencial, y antes de que el cableado de la vivienda se 
bifurque a todas las cargas y al inversor

, tal y como muestra el esquema de la instalación anterior.

Para realizar las conexiones quitar las dos tapas protectoras de las conexiones para tener acceso a las mismas.

Conectarlo como muestra la figura 

F1

, teniendo en cuenta las el esquema eléctrico del sistema visto anteriormente.

Se debe conectar un puente entre los puntos 1 y 4 del vatímetro (ver figura 

F2

).

Con el vatímetro se adjunta un conector aéreo RS-485 (ver figura 

F3

) para conectar el vatímetro al INGECON SUN Lite. 

Para cablear correctamente dicho conector seguir las siguientes instrucciones.

Pin

Señal

1

Verde (B+)*

2

Amarillo (A-)**

3

Blanco (GND)***

4

-

-

Las conexiones con el vatímetro (ver figura 

F2

) se realizarán tal y como se describe a continuación:

Conexión

Señal

11

Neutro del inversor 

Neutro de red

1

Línea de red 

Puente con 4

4

Puente con 1

7

-

3

Línea del inversor

6

-

9

-

41

Amarillo (A-)**

42

Verde (B+)*

43

Blanco (GND)***

* El pin 1 del conector aéreo debe conectarse al punto de 
conexión 42 del vatímetro.

** El pin 2 del conector aéreo debe conectarse al punto de 
conexión 41 del vatímetro.

*** El pin 3 del conector aéreo debe conectarse al punto de 
conexión 43 del vatímetro.

Una vez se ha conectado el vatímetro a la red siguiendo el esquema anterior, conectar éste al INGECON SUN Lite 
mediante el cable RS-485 proporcionado (ver figura 

F4

). Las cargas siempre se conectarán entre el vatímetro y el 

INGECON SUN Lite (ver esquema de la instalación).

English

Connecting the Wattmeter

All the connections must be made without voltage.

The Wattmeter must be installed on the DIN rail. 

The Wattmeter should be installed at the connecting point of the home 

after the circuit breaker switch and residual current device, and before the wiring of the home is branched off to all the 
loads and to the inverter

, as shown in the diagram of the previous installation.

To make the connections, get access to the connections by removing the two protective caps.

Connect it as shown in Figure

 F1 

, taking into account the wiring diagram of the system as seen above.

A jumper must be connected between points 1 and 4 of the Wattmeter (see Figure

 F2 

).

Attach a RS-485 connector (see figure

 F3 

) to connect the Wattmeter to the INGECON SUN Lite. To correctly cable this 

connector, follow the instructions below.

Pin

Signal

1

Green (B+) *

2

Yellow (A-) **

3

White (GND) ***

4

-

-

Connections with the Wattmeter (see Figure

 F2 

) should be carried out as described below:

Connection

Signal

11

Inverter neutral 

Grid neutral

1

Grid line 

Jumper with 4

4

Jumper with 1

7

-

3

Inverter line

6

-

9

-

41

Yellow (A-) **

42

Green (B+) *

43

White (GND) ***

* Pin 1 of the connector must be connected to connection 
point 42 of the Wattmeter.

* Pin 2 of the connector must be connected to connection 
point 41 of the Wattmeter.

* Pin 3 of the connector must be connected to connection 
point 43 of the Wattmeter.

Once you have connected the Wattmeter to the grid using the diagram above, connect this to the INGECON SUN 
Lite using the RS-485 cable provided (see Figure

 F4 

). Loads should always connect between the Wattmeter and the 

INGECON SUN Lite (see installation diagram).

11

1

L1

N

3

4

F1

41 42 43

31 32 33

3

6

9

11

1

4

7

A

B

D

E

C

A

F2

Castellano

A. Conexiones.

B. Joystick.

C. LED.

D. Selector.

E. Display.

English

A. Connections.

B. Joystick.

C. LED.

D. Selector.

E. Display.

1

4

2

3

F3

F4

Reviews: