Connect as shown in the following figures.
11
1
L1
N
3
4
11
1
L1
L2
L3
N
3
4
6
7
9
Single-phase installation*
Three-phase installation
*A jumper must be connected between points 1 and 4 of the wattmeter.
The wattmeter must be installed downstream from the power consumption and production
installation.
RS-485 communications are as indicated in the following table.
Connection
Signal
41
RS-485 A (-)
42
RS-485 B (+)
43
GND
You must connect the end of line resistors between connection points 41 and 42.
“2.4. Description of Connection Points”
for information on the connection with
INGECON EMS Manager.
Consult the accessories manual for communication via RS-485 for more information on the RS-485
wiring.
A65+
1 2 3 4 5 6 7 8 9 10 11 12 13
31 32 33 41 42 43 51 52 53 54 55 56 57
A
B
D
E
C
A
Wattmeter with protective covers installed
A65+
wattmeter with protective covers removed
A. Connections
B. Joystick
C. LED
D. Selector
E. Display
The protective covers give protection against direct electrical contact. These must be removed to make the
connections and reinstalled once the connections are made.
39
Appendix 1: Wattmeter
Ingeteam
AAX2022IQM01_ - Installation and Operation Manual
DE
EN
ES
FR
IT
PT