![INFOSEC P2 SunRise 2000 User Manual Download Page 12](http://html1.mh-extra.com/html/infosec/p2-sunrise-2000/p2-sunrise-2000_user-manual_2058197012.webp)
INFOSEC UPS SYSTEM - 4, rue de la Rigotière - 44700 Orvault - FRANCE - www.infosec-ups.com
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)2 40 94 29 51 - [email protected] – 04 10 AA 68 203 18
12
Connecting to the grid (AC utility)
To connect the AC cable, proceed as follows:
Step 1 - Measure grid’s (utility’s) voltage and frequency.
The voltage and frequency of utility are depended on different setting in each country.
Step 2 - Before wiring the PV-Inverter, ensure the main breaker in the primary utility breaker
box is switched OFF. Switch this breaker ON only after all wiring is completed as instructed
in the procedures.
Step 3 - Remove the screws that secure the case of the P2 SunRise and carefully remove
the cover. Remove the connection from the cover as shown here:
Step 4 - Insert utility wires through cable gland. Connect wires according to polarities
indicated on terminal block.
L1 means LINE1 (black), N means Neutral (White), L2 means LINE2 (Red), G means
system ground (yellow-green) as shown next page: