121
Installation Procedure
1. The installation begins with determining the installation position (front and rear rack
positions) and M5 cage nut
(5)
insertion location.
Item
Description
04
05a
05b
Screws M5 x 9.0 mm
Cage nuts M5, 3U position
Cage nuts M5, 2U position