60K(I) INSTALLATION
CLEARANCES, INPUT WIRE SIZE, GROUNDING AND OUTPUT WIRING
The following pages show the locations of the conduit landings and input/output terminals, plus any
clearances required in the installation. Before any wiring or placement is performed, please read the
following list of instructions below.
A. Be sure that a placement location is selected that meets all of the clearance requirements.
B. Conduit should be used for both input and output wiring.
C. Minimum wire sizes should be selected according to latest NEC standards based on the
following factors: environment, length, current and voltage.
D. Output neutral to ground is already bonded during manufacturing of the Series 700 AV/T.
E. Output requires 4 (5 including ground wire) conductors in a raceway assuming neutral as
a current carrying conductor. Verify for latest NEC standards.
NOTE: Installation is subject to local codes - verify with a local electrical inspector.
PAGE 14
INSTALLATION
Before installing the Power Processor make sure that the input voltage and the output
voltages match the unit’s specification plate.
CLEARANCES, INPUT WIRE SIZE, GROUNDING AND OUTPUT WIRING
The following pages show the locations of the conduit landings and input/output terminals, plus any clearances
required in the installation. Before any wiring or placement is performed, please read the following list of
instructions below.
A.
Be sure that a placement location is selected that meets all of the clearance requirements.
B.
Conduit should be used for both input and output wiring.
C.
Minimum wire sizes should be selected according to latest NEC standards based on the followingfactors:
environment, length, current and voltage.
D.
Output neutral to ground is already bonded during manufacturing of the Series 700 AV/T.
E.
Output requires 4 (5 including ground wire) conductors in a raceway assuming neutral as a current
carrying conductor. Verify for latest NEC standards.
NOTE: Installation is subject to local codes - verify with a local electrical inspector.