
Owner’s Manual |
Desktop Open Frame 2 Post Rack – Heavy Duty 10-3
2
Threaded
4
NavePoint.com
2. RACK ASSEMBLY
1. Attach the Right Side Bracket(C) to the Top Beam (A) and secure them with 4 of the
M6 * 12mm Screws (E) and 4 of the M6 Flange Nuts(H) using a Phillips Screwdriver
( not included).
2. Attach the Right Side Bracket(C) to the Bottom Base (B) and secure them with 4 of
the M6 * 12mm Screws (E) using a Phillips Screwdriver ( not included).
3. Attach the Left Side Bracket (D) to the Top Beam (A) and secure them with 4 of the
M6 * 12mm Screws (E) and 4 of the M6 Flange Nuts(H) using a Phillips Screwdriver
( not included).
4. Attach the Left Side Bracket (D) to the Bottom Base (B) and secure them with 4 of
the M6 * 12mm Screws (E) using a Phillips Screwdriver ( not included).