12    -    Uninteruptable Power Supply ~ 275707

Test unit India

 Test unit India

§

Connect the UPS on the test box.

§

Push the start test button.

§

Load the UPS with test software.

§

Turn pot meter R18 till leds 1 and 2 switch on.

§

Turn pot meter R13 till leds 3 and 4 switch on.

§

Seal the setting with nail polish.

§

Press the print ticket button. (a ticket will be printed)

§

Load the UPS with the final software.

§

Push the stop button.

§

Remove the UPS and place the UPS together with the ticket in an anti static (transport) bag

Summary of Contents for 275707

Page 1: ...2016 Inepro B V All rights reserved Operator Manual Uninteruptable Power Supply 275707 Uninteruptable Power Supply 275707 Product Version N A Version of this manual 1 1 0...

Page 2: ...Version 1 1 0 Inepro B V http www inepro com Table of Contents Functional description of the UPS 2 Connections 4 Programming connector and LED 6 Cables 8 Adjusting the UPS 10 Test unit India 12...

Page 3: ...Functional description of the UPS PartI...

Page 4: ...Voltage of battery High signal Battery capacity sufficient Switching signal 1 Hz Battery almost empty replacement necessary No signal Battery empty The PayCon does not start up a transaction 2 Towards...

Page 5: ...Connections PartII...

Page 6: ...rol cable 2 wired cable Power cable to PayCon Black wire Power cable from net adaptor Connecting the PayCon Cable Function White brown PayCon power from UPS Red blue Power for UPS 5V Can be plugged in...

Page 7: ...Programming connector and LED PartIII...

Page 8: ...wer Supply 275707 Programming connector and LED Programming connector and LED Programming connector For loading a programme in the microcontroller LED Long signal power from net adaptor Short signal p...

Page 9: ...Cables PartIV...

Page 10: ...8 Uninteruptable Power Supply 275707 Cables Cables Power cable between UPS and PayCon Interface cable between UPS and PayCon...

Page 11: ...Adjusting the UPS PartV...

Page 12: ...ly the PayCon is connected Power the net adaptor in a wall socket Set the power supply Voltage on 13 7 Volt Turn the pot meter R18 till the led D11 right side UPS switches on Measure with the Fluke sc...

Page 13: ...Test unit India PartVI...

Page 14: ...test software Turn pot meter R18 till leds 1 and 2 switch on Turn pot meter R13 till leds 3 and 4 switch on Seal the setting with nail polish Press the print ticket button a ticket will be printed Lo...

Page 15: ...Version 1 1 0 13...

Page 16: ......

Reviews: