InelControl ORS-01IC Installation And Operation Manual Download Page 3

5.1.4 Positioning the magnets in relation to the  
reed switches 

 

Open the sliding gate, 

 

attach  the  tray  with  the  reed  switches  with 
reed  switch  O  (CON2)  opposite  magnet  O. 
The  reed  switch  should  not  be  fixed  in  the 
tray.  Connect  the  ohmmeter  to  the  reed 
switch. Gently move the reed switch left and 
right to determine the middle of its operating 
range. Fix the reed switch in place.  

 

Close  the  sliding  gate.  Move  reed  switch  Z 
(CON1)  in  the  tray  and  place  it  opposite 
magnet  Z.  Do  not  fix  the  reed  switch. 
Connect  the  ohmmeter  to  the  reed  switch. 
Gently move the reed switch left and right to 
determine the middle of its operating range. 
Fix the reed switch in place.  

5.1.5 Installing and connecting the controller 

Install  the  controller  and  the  tray  with  reed  switches 
inside  the  sliding  gate  control  unit.  If  this  is  not 
feasible,  install  the  controller  and  the  tray  with  reed 
switches close to the sliding gate control unit. Secure 
the  controller,  the  reed  switches  and  the  insulated 
cables  against  mechanical  damage  and  weather 
conditions. 

Fig.  4  shows  the  connection  diagram.  Route  the 
cables to the controller enclosure by the grommets to 
ensure  proper  sealing  and  arrange  in  loops  to 
prevent water ingress. 

Connect the OUT output to the manual control input 
of the sliding gate control unit.  

The controller may be supplied with 12 V DC or 24 V 
AC (from  the sliding gate control unit  or  the external 
power  supply).    Fig.  2  shows  the  wiring  diagram  for 
both cases. Fig. 5 shows 12 V power supply from the 
control unit. 

The  cables  must  not  block  the  control  unit’s 
enclosure  and  must  not  affect  its  weather  protection 
components. 

 

Fig. 4 Controller wiring diagram 

 

5.1.6 Registering and configuring the controller 
in InelControl system 

To register and configure of the controller in InelControl 
system, see “Control unit user manual and InelControl 
system configuration”.

 

The device will be automatically detected by the system. 
Press and hold S1 on the controller board for approx. 1 
second.  If  the  device  is  not  automatically  detected, 
change the controller position and try again. 

After configuring the controller, check the received signal 
level in 

Advanced device information

 tab in InelControl 

app. For correct communication, the level should be min. 
-90 dBm  

5.2 Sectional gate 

Similar to the sliding gate, installation of reed switches is 
required.  

Fig.  5  shows  the  operation  of  reed  switches  in  the 
sectional gate.  

The magnet  is  attached  to the  carriage  (C)  and  the  reed 
switches are attached to the bar (R).  

The  reed  switches  are  at  a  distance  that  will  prevent 
nonselective  operation.  Choose  the  optimal  position  of 
the  reed  switches  in  relation  to  the  magnet  (see  the 
sliding gate section). 

Install  he  controller  near  the  gate  control  unit.  Fig.  4 
shows the wiring diagram.  

 

Fig.  5  Operation  of  open/close  switches  of  the  sectional  gate:  
a) 

door 

closed 

reed 

switch 

closed,  

b) door open 

– reed switch O closed

 

 

Reviews: