
Ventis™ LS Product Manual
© Industrial Scientific Corporation
25
Monitor with positive flow regulator.
PREPARE THE GAS CYLINDER FOR USE
1
Attach the correct regulator to the gas cylinder and turn clockwise to tighten.
2
Attach either end of the tubing to the cylinder’s nipple.
3
Attach the other end of the tubing to the calibration cup’s nipple.
DO NOT ATTACH THE CALIBRATION CUP TO THE MONITOR OR APPLY THE GAS BEFORE REACHING THE
“APPLY GAS SCREEN”.
If gas is applied before that point, the monitor will go into alarm and a failure will be
logged.