background image

 

01.05.2014 (release date and version)  

_________________________________________________________________________________ 
FB TS AS7 01                    ICG® Standard Operating Procedure | released by ICG® Service Department                                                                   9 

 

4)    Handlebar assembly 

       a)  Bring handlebar to its maximum vertical position. Do not remove warning tape on slider prior 

to handlebar is mounted to the upper slider. 

       b)    

ATTENTION!

 

Place the flat handlebar support under the console bracket as shown on the          

               

picture. 

               Mount handlebar weldment using the M8 x 25 x 1.0P counter sunk hex. socket bolt from   
               beneath using a straight shaft (round head) 6mm Allen key socket wrench. 
 

 Maximum torque: 25-30 Nm. 

       c)     Mount the plastic end cap on the lower handlebar slider and check the horizontal and  
 

 vertical adjustment as described in the separate SOP (FB TS HB7 01). 

                       

  

                                           a)                                                                                   b) 

                      

 

                                                                                                         c) 

Summary of Contents for TOMAHAWK IC5

Page 1: ...by ICG Applicable for Product Version IC5 IC7 two stage drivetrain Applicable for Product Art No For both SKU s THK IC5 IC7 powered by ICG and Matrix IC5 IC7 powered by ICG THK IC TKIC5B 01 MX IC MXIC...

Page 2: ...rsion _________________________________________________________________________________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 2 ALL PART DESCRIPTIONS DRAWING...

Page 3: ...ludes Button Head Sleeve with Internal Thread Hex Socket M8 x35 x 1 5P ss304 Stainless Steel 1x Button Head Bolt Hex Socket M8 x12 x 1 5P ss304 Stainless Steel ISO7380 1x Transport Wheel 1x 2 F 140 02...

Page 4: ...REQUIRED TOOLS TOOLS SIZE MM QUANTITY Open end spanner or equivalent 17mm 1 Pedal wrench 15mm 1 Hex socket 13mm 1 Open end spanner or equivalent 10mm 1 Straight shaft round head 6mm Allen socket 6mm 1...

Page 5: ...fore assembly Please refer to our service video WARNING The IC7 indoor cycle is very heavy It requires at least 2 people to remove the bike from the packaging and for assembly the bike as it s describ...

Page 6: ...ting Procedure released by ICG Service Department 6 1 Rear stabilizer assembly a Secure upper handlebar and seat post sliders Tilt bike carefully until it rests on the floor supported by the front Sty...

Page 7: ...S7 01 ICG Standard Operating Procedure released by ICG Service Department 7 2 Front stabilizer assembly a Carefully tilt bike until the rear part of the shroud rests on the Styrofoam as shown on the p...

Page 8: ...sition a Place the bike as shown on the picture b Make sure that the seat is fixed in a level horizontal and vertical position Seat clamp must be tightened securely from both sides to minimize looseni...

Page 9: ...ape on slider prior to handlebar is mounted to the upper slider b ATTENTION Place the flat handlebar support under the console bracket as shown on the picture Mount handlebar weldment using the M8 x 2...

Page 10: ...assembly a Carefully slide the IC7 console into its console bracket b Tighten by hand the M 5 x 25 x 0 8P bolt attaching the IC7console to the handlebar by using the 3mm Allen Key a b 6 Pedal assembly...

Page 11: ...dard Operating Procedure released by ICG Service Department 11 7 End of the assembly process Simulate a brief session checking the bike is in good working order 8 IC7 console commissioning a Turn cran...

Page 12: ...______________________________________________________________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 12 9 Settings Select GENERAL from the main menu and foll...

Page 13: ...________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 13 10 Brake Calibration Select BRAKE CALIBRATION from the main menu and follow the instructions until finalize...

Page 14: ...______________________________ FB TS AS7 01 ICG Standard Operating Procedure released by ICG Service Department 14 11 Offset Select OFFSET from the main menu and follow the instructions until finalize...

Page 15: ...andard Operating Procedure released by ICG Service Department 15 12 End of operation Select EXIT once you finish the BRAKE CALIBRATION and OFFSET process Please refer to the IC7 console owner manual t...

Reviews: