![Indmar 5.7L MPI Operator'S Manual Download Page 23](http://html1.mh-extra.com/html/indmar/5-7l-mpi/5-7l-mpi_operators-manual_2053963023.webp)
Indmar Marine Engines
1-5
After the first ten hours but before 20 hours of operation,
take your boat to the dealer for its first engine and trans-
mission oil and filter change and engine checkup. Your
Indmar dealer is best equipped to check the engine
immediately after break-in.
After the break-in procedure is over, your boat may be
operated at any speed. Be sure to check the wide open
throttle operating range; refer to Chapter 4, Selecting A
Propeller.
Do not exceed maximum RPM recommended
for your engine. Exceeding the maximum
RPM may result in damage to the engine.
OME0502-15 Body.qxp_OM0502-05 Body.qxd 5/20/14 12:45 PM Page 1-5
Summary of Contents for 5.7L MPI
Page 1: ...Operator s Manual...
Page 24: ...1 6 Indmar Marine Engines OME0502 15 Body qxp_OM0502 05 Body qxd 5 20 14 12 45 PM Page 1 6...
Page 30: ...2 6 Indmar Marine Engines OME0502 15 Body qxp_OM0502 05 Body qxd 5 20 14 12 45 PM Page 2 6...
Page 44: ...4 10 Indmar Marine Engines OME0502 15 Body qxp_OM0502 05 Body qxd 5 20 14 12 45 PM Page 4 10...
Page 68: ...6 22 Indmar Marine Engines OME0502 15 Body qxp_OM0502 05 Body qxd 5 20 14 12 45 PM Page 6 22...