
12/89:
PARTS-83
19. Connect 1/2" x 52" hose to the bottom port on the
two-section valvebank as shown. Run hose under the
slew cylinder. This hose will connect to the T on the
tank in step 18.
20. Run the 52" return hose from the two section
valvebank to the tank on the front side of the crane as
shown. Then, connect to the T on the tank.
21. Install four #5 fittings on valvebank.
20020909
Summary of Contents for 12/89
Page 91: ...12 89 PARTS 91...