background image

Aqua-Grade Linear

Installation Guide

Issue 2
01/12/15

CONTENTS

Please read and understand this installation guide fully before attempting to install the product.

Always allow new screeds to fully dry before applying the final finish of waterproofing and tiles.
Further guidance can be found in BS 8204 or BS 5385-3:2007

Please follow all installation guides supplied with the Linear drain and waterproofing systems.

Section 1, Components                         

Section 2, Configuration types   

Section 3, Basic assembly rules

Section 4, General Installation guidance

Section 5, Assembly methods

If you require any further information about this product please contact our technical team on: 01460 258 682

SAFETY

Please read these installation instructions carefully before proceeding.

Keep guide for future reference.

Incorrect installation will invalidate the guarantee.

Make sure there are no hidden pipes or cables in the floor or walls where you intend to drill.

Wear safety goggles, shoes and appropriate clothing.

Impey Showers, Conquest Business Park, Ilton, Somerset, TA19 9EA, TEL: 01460 256090  FAX: 01460 259800
[email protected]                                                                                      www.impeyshowers.com

Page 2

Page 3

Page 4

Pages 5-7

Pages 8-12

Summary of Contents for Aqua-Grade Linear

Page 1: ...assembly rules Section 4 General Installation guidance Section 5 Assembly methods If you require any further information about this product please contact our technical team on 01460 258 682 SAFETY Pl...

Page 2: ...ate SCR SPACER Spacer for moulded foot SCR FOOT Moulded foot SCR IMP Insulation mounting plate Optional available separately Can be used with both types of foot Section 1 Components Page 2 Parts used...

Page 3: ...gradient 2 Walls required 2 falls of gradient 3 Walls required 1 fall of gradient Section 2 Configuration types The Aqua grade Linear may be arranged in a wide range of sizes and configurations use th...

Page 4: ...lue corner section must always have 2 feet fitted When using configurations that start from a wall it is important that 2 feet are fitted to the first section to support the section properly excludes...

Page 5: ...clip the feet mounting plates onto levelling feet 4 Install the gully and waste pipe in an approved manner 6 Position the starter section correctly and mark the position of the mounting plates Tempora...

Page 6: ...ated and levelled correctly this illustration shows a corner section but this is dependant on the configuration type 12 When making levelling adjustments it is important that the feet are only just in...

Page 7: ...to prevent hollow areas 18 When fully filled it may be necessary to allow the screed to dry out slightly before final finish trowelling When complete the shuttering can be removed and the remaining fl...

Page 8: ...or 4 falls no walls configuration 5 Please follow these steps as a general guide for this type of configuration alternative sizes are available Always work in a clockwise or right to left direction Af...

Page 9: ...r 3 falls 1 wall configuration Please follow these steps as a general guide for this type of configuration alternative sizes are available Always work in a clockwise or right to left direction After e...

Page 10: ...lls corner drain can be assembled as Left hand and Right hand version The assembly process for these is slightly different please see notes below and assembly guide for these types on page 11 Parts fo...

Page 11: ...ls 2 walls configuration left and right hand Please follow these steps as a general guide for this type of configuration alternative sizes are available Always work in a clockwise or right to left dir...

Page 12: ...ly order for 1 fall 3 walls configuration Please follow these steps as a general guide for this type of configuration Always work in a clockwise or right to left direction After each row is completed...

Reviews: