STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Attach the 133” Lower Cable (#53) to the opening on the Leg Developer (#17). Attach a Pulley
(#28) to the opening. Secure it with one 3/8” x 2 5/8” Allen Bolt (#60), two
∅
½” Bushings
(#71), two
∅
3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).
B.) Draw the Cable underneath the Pulley to the open slot on the Vertical Beam (#4). Install
another Pulley as described in Step A.
C.) Draw the Cable underneath the Pulley then upward to the Angled Double Floating Bracket
(#24) previously installed. Attach a Pulley to the open bracket. Secure it with one 3/8” x 1 ¾”
Allen Bolt (#61), two
∅
3/8” Washers (#77), and one 3/8” Aircraft Nut (#74).
D.) Draw the Cable around the Pulley the downward to the open bracket on the Main Base Frame
(#2). Install another Pulley.
E.) Draw the Cable around the Pulley then upward to the Flat Double Floating Pulley Bracket
(#23) previously installed. Install another Pulley.
F.) Draw the Cable around the Pulley then connect the Cable to the Main Base Frame with two
Hooks (#46) and a 9-linked Chain (#49).
G.) Adjust the tension of the Cable Loop System by adjusting the length of the Chain.
17
Summary of Contents for MARCY MWM 800
Page 4: ...Hardware Identifier 3...
Page 5: ...4...
Page 6: ...5...
Page 7: ...6...
Page 8: ...7...
Page 10: ...DIAGRAM 1 9...
Page 12: ...DIAGRAM 2 11...
Page 15: ...CABLE LOOP DIAGRAM 14...
Page 19: ...DIAGRAM 7 18...
Page 20: ...19...
Page 22: ...21...