STEP 2 (See Diagram 2)
A.) Attach a Support Frame (#2) to the Floor Stabilizer (#6). Secure it with one Bracket (#16),
two M12 x 4” Carriage Bolts (#28),
∅
1” Washers (#29), and M12 Aircraft Nuts (#30).
B.) Insert two Guide Rods (#12) into the holes on top of the Base Frame (#3). Secure each
Guide Rod with one M10 x 1” Allen Bolt (#38) and
∅
¾” Washer (#32) from the bottom.
C.) Slide one 1” Thick Rubber Bumper (#22) onto each Guide Rod from top. Note: WD40 or
similar lubricant might be needed. Slide one Guide Rod Sleeve (#5) onto each Guide Rod
from top. Then slide one more 1” Rubber Bumper (#22) onto each Guide Rod from the top.
D.) Screw a Small Pulley Bracket (#8) to the top of the Weight Holder (#4). Slide the Weight
Holder (#4) onto the two Guide Rods (#12) from the top. Slide one ½” Thick Rubber Bumper
(#23) and Olympic Sleeve (#13) onto the Weight Holder from each end. Clip one Spring Clip
(#25) onto each end of Olympic Sleeve.
E.) Repeat the Step A, B, C, D above to install the other side.
F.) It is strongly recommended to spray lubricant such as WD-40 on the Guide Rods to
minimize friction.
5