STEP 8 (See Diagram 8)
A.) NOTE: Help of another person is strongly recommended for this step. Place the Lifting
Sleeve (#13) in between the two Safety Stop Frames (#26). Align the holes and insert the
Weight Bar (#28) all the way through. Center the bar and secure it with two M8 x 3/8” Allen
Bolts (#88) on each side.
B.) Turn the safety catch hook forward on the Lifting Sleeve to secure its position on the
selected holes on the Front Vertical Frames (#2). Attach a Long Olympic Sleeve (#48) to
each end of the Weight Bar. Attach a Spring Clip (#46) to the Sleeve.
C.) Attach six Weight Posts (#27) to the Left & Right Vertical Frames (#3&4). Secure each
Weight Post with one M10 x 1” Allen Bolt (#74) and Ø ¾” Washer (#86).
D.) Attach six Olympic Sleeves (#47) to the Weight Posts. Attach six Spring Clips (#46) to the
sleeves. Insert the Left & Right Bar Holders (#16 & 18), the Left & Right Safety Catches
(#17 & 19) into the selected holes on the Front Vertical Frames (#2).
19
Summary of Contents for IGS-5100
Page 5: ...SMITH MACHINE HARDWARE PACK 4 ...
Page 6: ...SMITH MACHINE HARDWARE PACK 5 ...
Page 7: ...SMITH MACHINE HARDWARE PACK 6 ...
Page 8: ...SMITH MACHINE HARDWARE PACK 7 ...
Page 10: ...DIAGRAM 1 9 ...
Page 13: ...DAIGRAM 3 12 ...
Page 15: ...CABLE LOOP DIAGRAM 14 ...
Page 19: ...DIAGRAM 7 18 ...
Page 21: ...EXPLODED DIAGRAM 20 ...
Page 23: ...MULTI PURPOSE BENCH HARDWARE PACK 22 ...
Page 24: ...MULTI PURPOSE BENCH HARDWARE PACK 23 ...
Page 31: ...30 ...