STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) Attach the 142” Upper Cable (#35) to the opening at the front of the Upper
Frame (#4). Note: The Ball Stopper on the cable should be underneath the
Frame.
B.) Attach a Pulley (#63) to the opening. Secure it with one M10 x 2 3/8” Allen Bolt
(#71), two Pulley Bushings (#50), and one M10 Aircraft Nut (#85).
C.) Draw the Cable towards the back of the machine to the opening on the Upper
Frame. Repeat the Procedure B above to install another Pulley.
D.) Draw the Cable around the Pulley then pull back towards the opening on the
Front Press Base (#11).
E.) Attach a Pulley to the opening on the Front Press Base. Secure the Pulley with
one M10 x 5 1/8” Allen Bolt (#68) and M10 Aircraft Nut (#85).
F.) Draw the Cable around the Pulley then to the opening on the Upper Vertical
Frame (#14). Repeat Procedure B above to install another Pulley.
G.) Draw the Cable around the Pulley then downward. Attach the Cable to a Double
Floating Pulley Bracket (#31). Install another Pulley. Let the bracket hanging for
now.
H.) Pull the Cable upward to the open bracket underneath the Upper Frame. Install a
Pulley to the bracket.
I.)
Pull the Cable downward between the two Guide Rods to the Selector Rod
(#17). Fully thread the bolt at the end of the Cable into the top opening on the
Selector Rod.
J.) Connect the Lat Bar (#18) to a Short Chain (#49) with a C-clip (#53). Then
connect the Short Chain to the Upper Cable with another C-clip.
14
Summary of Contents for COMPETITOR WM-1505
Page 5: ...HARDWARE PACK 4 ...
Page 6: ...HARDWARE PACK 5 ...
Page 7: ...HARDWARE PACK 6 ...
Page 9: ...DIAGRAM 1 8 ...
Page 11: ...DIAGRAM 2 10 ...
Page 14: ...CABLE LOOP DIAGRAM 13 ...
Page 16: ...DIAGRAM 5 15 ...
Page 19: ...DIAGRAM 7 18 ...
Page 21: ...20 ...