background image

Page 11

DUOTROL

TM

 BALANCING SYSTEM 

PROCEDURES, STEPS 1 THROUGH 8.

 

Step 1:

 Press the (+) and (–) buttons simultaneously 

until you see the yellow light. Once the indicator light 

turns yellow you are in balancing mode.

Step 2:

 When in balancing mode the selector switch 

becomes the motor selector switch. INTER (Right 

Motor), CONT (Both Motors) and OFF (Left Motor)

Step 3:

 Once the total cfm needed is determined, 

you can start balancing the HRV/ERV. Set your fresh 

air supply by selecting the «OFF» position on the 

Duotrol

TM

. Install your magnehelic gauge and air flow 

grid in the fresh air duct.

Step 4:

 Press the (–) button to decrease the cfm or 

press the (+) button to increase the cfm.

Step 5:

 Then perform the same operation on the stale 

air side by selecting the «INTER» position on the 

DuotrolTM.

Step 6:

 The «CONT» position will allow you to 

adjust the cfm on both motors proportionately (if 

necessary).

Step 7:

 Once this is completed, you have set the high 

speed on your HRV/ERV. To exit the balancing mode 

you must press (+) and (–) buttons simultaneously 

and release. The indicator light will turn green to 

indicate normal operation mode.

Step 8:

 Once high speed is set and locked, switch 

to continuous on the Duotrol

TM

.  By using (+) and (-) 

buttons set continuous speed.

USING THE SELECTOR SWITCH

 

TIP TO INSTALLER

: When on Balancing Mode, the 

Selector Switch allows you to choose the motor you 

want to set.

A) CLOSED DUOTROL COVER
1. INTER

 (Exhaust Motor)

2. CONT

 (Both Motors)

3. OFF

 (Supply Motor)

B) OPEN DUOTROL COVER
1. UP

 (Exhaust Motor)

2. MIDDLE

 (Both Motors)

3. DOWN

 (Supply Motor)

WITH THE DUOTROL™ 

SYSTEM

 

GREEN LIGHT 

MODE SELECTOR

YELLOW LIGHT 

BALANCING MODE

  14. BALANCING THE UNIT

WITH AN AIRFLOW GRID 

&  MAGNEHELIC GAUGE

Magnehelic Gauge with Air Flow Grid

Inserting Air flow grid in duct

Seal Air flow grid in duct with duct tape.

Summary of Contents for PH 10.22 HRV ES

Page 1: ...n order to offer at all times quality products that are highly competitive Imperial Air Technologies 480 Ferdinand Blvd Dieppe NB E1A 6V9 1 888 724 5211 Fax 506 388 4633 www imperialgroup ca RESIDENTI...

Page 2: ...ation requirements 3 2 Fitting equivalent lengths 4 3 Types of Installations 5 4 Installation Kit 7 5 Finding a suitable installation area for HRV or ERV 7 6 Installation of the HRV ERV 7 7 Insulated...

Page 3: ...CFM L S CFM REQUIRED Master Bedroom x 20 cfm 10 L s With Basement x 20 cfm 10 L s Single Bedroom x 10 cfm 5 L s Living Room x 10 cfm 5 L s Dinning Room x 10 cfm 5 L s Family Room x 10 cfm 5 L s Recre...

Page 4: ...t length 35 ft 10 7 m Round plastic diffuser equivalent length 100 ft 30 5 m NOTE Maximum airflow assumes diffuser is in full open position Tee take off equivalent length 50 ft 15 24 m Angle boot equi...

Page 5: ...or the forced air system s manufacturer The HRV and forced air system must be in continuous mode to achieve maximum comfort and to avoid cross contamination NOTE TO INSTALLER Dwellings with multiple f...

Page 6: ...oved tools and material Also use steel duct connections for these type of installs hen Distribution to living space A B A B Not less than 10ft 3 m HRV ERV Distribution to living space 18 457 cm 6 ft 1...

Page 7: ...separate circuit breaker is also recommended You should have access to a condensate drain near the HRV ERV to avoid the use of condensate pump 6 INSTALLATION OF THE HRV ERV The entire line of Imperia...

Page 8: ...ct with the collar before securing over the four hooks The Fresh air from outside and the Exhaust air to outside from the termination ducts to the HRV ERV must be fully insulated of thermal insulation...

Page 9: ...RV have a dedicated receptacle with 115v It is not recommended to connect unit with an extension cord If no receptacle is available please call an electrical contractor and have one installed Insure p...

Page 10: ...aust air to outside AIRFLOW INSTALLATION IMPORTANT Install ventilation hood a minimum of 18 457mm above grade Do not install under a deck enclose porch patio garages crawl spaces or attics WARNING Ins...

Page 11: ...position will allow you to adjust the cfm on both motors proportionately if necessary Step 7 Once this is completed you have set the high speed on your HRV ERV To exit the balancing mode you must pres...

Page 12: ...NNECTION RD 1 2 wires RD 3D RD 4D 4 wires XDH Series only R G B W G R B G R R W B G To Casing Screw for Ground Jumper JP 4 2 Relays 1 Relay LVC Version 1 LVC Version 2 Jumper JP 4 R G B W G R B G R R...

Page 13: ...e Alternate Forced Air Wiring LOCATING THE WIRING DIAGRAM NOTE TO INSTALLER Wiring Diagram for the entire line of HRV ERV Models are placed on the back of each Exhaust motor bracket CAUTION Thermostat...

Page 14: ...ll bracket is used for hanging the units Verify that flexible duct connections are use between the HRV or ERV and the rigid duct Verify that the motors are operating and are not obscured by any debris...

Page 15: ...vers Ref Fig 17 1 for proper orientation of louvers Twice a year and clean it as required consult your owner s manual for instructions on inspecting and cleaning the core A build up of dust and dirt c...

Page 16: ...Imperial Air Technologies 480 Ferdinand Blvd Dieppe NB E1A 6V9 1 888 724 5211 Fax 506 388 4633 www imperialgroup ca Item PR0754...

Reviews: