CAS Series Assembly Instructions
- Set male corners on crate, secure
- Install screws (3) with nuts inside crate
-> Loosely secure all (3) screws, tighten with
screws once all are in place
4
- Move to bottom of crate, place side panel on side
of crate (Either direction, the part is symmetric)
-> Slide Side Panel under the Top Panel's flange
to align screw holes
- Secure Side Panel to Front & Back Panels with (6)
screws and nuts.
-> Loosely tighten all screws, tighten with tools
once all in place.
5
- Set Airline Rail on side of crate.
- From inside of crate, start all (6) screws into rail,
then tighten all screws.
6
Page 3