INSTALLATION:

Set-up the masonry jobs creating an opening in the wall where 

the frame will be installed (1), paying attention to envision the 

space for the six slots for inserting the respective support fins 

(2) and a space under the frame sufficient to carry out the kit 

connections (Fig. 4).

N.B.:

 it is very important to provide a support screed (A) in 

the area under the Super Trio Container at the support point 

of the storage tank.
It is also possible to fix the frame to the wall with plugs (not 

supplied) using the special four holes Ø 8 mm (6).

The Super Trio Container is closed by the side cover (5), where 

the air intake grid is present, by the upper cover (3) where it 

is possible to let the flue out and by the door (4) which can be 

opened using the handle and only after having unlocked the 

vertical locks in order to access the internal components.

Internally there are appendices (7) prepared for the attachment 

of the various components.

Attention: 

The installation of the Super Trio Container inside 

the wall, must guarantee a stable and effective support to the 

appliance it contains. This kit only ensures adequate support 

if it is inserted properly (according to good practice rules) 

and positioned in square with respect to the wall following 

the instructions given below, thus guaranteeing the correct 

functionality of the front doors. The Super Trio Container is 

not a supporting structure and cannot replace the piece of wall 

removed. It is therefore necessary to check its correct positioning 

inside the wall.
For safety reasons, it is necessary to carefully seal the housing 

compartment of the Super Trio Container in the wall, in com-

pliance with Standards in force.

Make sure that the knockouts for the hydraulic connections 

have been removed at the intended pipe path. Be sure to remove 

the relevant sections based on the flue (“B type” and “C type” 

installations) and the intake ducts (only for “C type” installation). 

Make sure that the pre-cuts for the various connections have 

been removed from the intended route.

Insert the frame inside its own seat, remembering to open the 

six support fins (2) before inserting it.

After installing the frame, it is possible to insert the thermal kits 

by hooking them to the provided hooks.

Now make the connections according to your needs.

Some holes are pre-cut smaller with respect to the useful size 

in order to allow them to be enlarged according to your needs.

Once the frame has been installed, it is necessary to prepare 

all the connections for the hydraulic connection to the specific 

product selected in the lower and lateral part.

N.B.:

 The connection unit is not supplied, but is sold separately 

(optional). To ease installation, choose whether to make the 

connection at the rear, bottom or side (bottom right) of the 

Container Super Trio (see 

Fig. 3

).

For electrical connections, separate the connection to the 

electricity grid and the connection to the temperature control 

by passing the cables through the various openings provided.

Make the gas connection (where required). The gas pipe can 

exit downwards, through the rear outlet, lower outlet, right side 

outlet or from the front using the appropriate pre-cut already 

provided on the door (see figures below).
Once out from the front, it is possible to turn the gas pipe in the 

preferred direction.

N.B.:

 to install the gas supply pipe, under or out of route, comply 

with the installation standards UNI 7129 / 7131-99.
Install the refrigerant gas circuit connection pipes using the 

pre-drilled holes. The pipes must protrude inside the Solar 

Container kit as much as necessary to allow connection to the 

chosen product

N.B.:

 For the installation of the refrigerant gas circuit and 

connection to the heat pump, comply with the UNI EN 378 

Standards.

Attention:

 For assembly / installation and commissioning of the 

various components inside the Super Trio Container, please refer 

to the specific instruction booklet of each individual product.
Once the connections have been made, assemble the flue ac-

cording to the instructions in the boiler instructions manual.
Lastly, close the frame using the front door.
At this point, the installation is complete and the frame cover 

can be painted according to requirements and taste.

Summary of Contents for COD. 3.030394

Page 1: ...Instructions and warnings IE IT Istruzioni e avvertenze COD 3 030394 CONTAINER SUPER TRIO SUPER TRIO CONTAINER...

Page 2: ...incipi della buona tecnica IL PRESENTE FOGLIO DA LASCIARE ALL UTENTE ABBINATO AL LIBRETTO ISTRUZIONI DEL PRODOTTO FINITO L installazione o il montaggio improprio dell apparecchio e o dei componenti ac...

Page 3: ...ensa e per il collegamento della termoregolazione Nella sua parte laterale destra dotato dei fori necessari per gli allacciamenti alle pompe di calore Nella parte superiore vi sono situati i fori per...

Page 4: ...4 DISTANZA MINIMA DI INSTALLAZIONE ATTENZIONE Posizionare il lato sinistro del Container ad almeno 100 mm di distanza dalla parete per permettere le normali operazioni di manutenzione Fig 2...

Page 5: ...ola di scarico 3 bar ALLACCIAMENTO LATERALE DESTRO ALLACCIAMENTO POSTERIORE ALLACCIAMENTO INFERIORE TABELLA ALLACCIAMENTI ZONE Zona Y Zona X Magis Combo Plus Zona 2 miscelata Optional Zona 1 diretta M...

Page 6: ...ne solo per installazione tipo C Inserire il telaio nella propria sede ricordandosi di aprire le sei alette di sostegno 2 prima di inserirlo Alcuni fori sono pretranciati pi piccoli rispetto alla misu...

Page 7: ...d c e c 1 2 6 2 5 4 3 6 A a Legenda disegni installazione Identificazione univoca componente Identificazione sequenziale operazione da svolgere Identificazione componente generico o non fornito in dot...

Page 8: ...8 Fig 5 Fig 6 Fig 7 Fig 8...

Page 9: ...tion it is necessary to comply with the provisions specified in the regulations in force and with the principles of good practice Improper installation or assembly of the Immergas appliance and or com...

Page 10: ...ate drain and for the connection of the thermoregulation In its right side part it is equipped with the holes necessary for connections to the heat pumps The upper part has the holes for the outlet to...

Page 11: ...11 MINIMUM INSTALLATION DISTANCE ATTENTION Place the left side of the Container at least 100 mm away from the wall to allow normal maintenance operations Fig 2...

Page 12: ...9 with Super Trio G 1 2 G 1 2 G 1 2 G 3 4 G 3 4 G 3 4 G 3 4 3 8 SAE 5 8 SAE Magis Combo Plus 12 14 16 Magis Pro 12 14 16 with Super Trio Top G 1 2 G 1 2 G 1 2 G 1 G 1 G 1 G 1 3 8 SAE 5 8 SAE Key G Ga...

Page 13: ...he intended route Insert the frame inside its own seat remembering to open the six support fins 2 before inserting it After installing the frame it is possible to insert the thermal kits by hooking th...

Page 14: ...c e c 1 2 6 2 5 4 3 6 A a Fig 4 1 a A Drawings key installation Unambiguous component identification Sequential identification of the operation to perform Identification of generic or not supplied com...

Page 15: ...15 Fig 5 Fig 6 Fig 7 Fig 8...

Page 16: ...nd so on The data declared refer to new products that are correctly installed and used with respect to the Standards in force N B correct periodic maintenance is highly recommended Cod 1 043593 rev ST...

Reviews: