1.15  EXPANSION VESSEL

The water held in the accumulator of the SOLARSMART solar 

collector is subjected to notable thermal excursions and, as a result, 

important variations in volume.

The system is protected from the overpressure caused by these fluc-

tuations by the safety and one-way valve which, if necessary, opens 

and allows the system to return to its correct working pressure.

Should the user wish to prevent the safety and one-way valve from 

opening, it is advisable to use an EXPANSION VESSEL, suitably 

sized according to use.

When the EXPANSION VESSEL is assembled, the overpressure 

that can originate in the accumulation tank is absorbed by vessel 

deformation, therefore the safety valve does not need to intervene 

in normal conditions of use.

The EXPANSION VESSEL must be installed between the safety 

and one-way valve and the inflow connection of the solar collector.

The EXPANSION VESSEL must be connected using all the me-

thods indicated for heating systems, therefore it must be directly 

connected to the accumulator (without placing valves or taps 

between them) and pre-set at a pressure of 0.5 bar less than that 

of the system working pressure.

The EXPANSION VESSEL and its pre-set values must be sized 

using the normal formulas that can be found in normal hydraulic 

documents.

The expansion vessel must be installed by specialist technicians 

and/or companies.

1.16 STARTING

Use of the covering sheet

The SOLARSMART integrated solar collector is supplied with a 

plasticizer-free PVC covering sheet which serves the purpose of 

blacking out the surface that captures the solar irradiation. This 

will prevent the product from overheating from solar exposure 

in the event of the collector being installed but not connected to 

the water mains (therefore with no water inside), or in any other 

situation where the collector volume is wholly or partially empty.

The solar collector is not designed for exposure to direct sunlight 

unless it is filled with water. If to the contrary, the direct irradia-

tion on the empty product will cause overheating and subsequent 

damage to the internal components.

In the event of using a different sun protection system, make 

sure that it is plasticizer-free in order to prevent damage to the 

transparent cover.

The cover sheet must be kept in position from system 

installation to starting. Do not remove it before having 

filled the collector.

Exposure to the sun when the system is empty can 

damage the product; in this case the manufacturer 

will not recognise any guarantee rights.

If the solar collector should not be covered at the time of com-

missioning, cover it with the supplied cover or with a suitable 

blackout system and wait no less than 3 hours before starting the 

system loading operation.

In any case, the system must be charged with the cold system 

(covered collector or early in the day).

Keep the cover sheet for future use.

If used again, position the sheet carefully, making 

sure that the smooth grey PVC side is turned towards 

the outside.

Image of the sticker on the cover sheet

ATTENTION

ONLY EVER REMOVE THE PROTECTION AFTER HAVE 

FILLED THE SYSTEM WITH WATER.

Summary of Contents for 3.029660

Page 1: ...ARSMART 150R SOLARSMART 220 SOLARSMART 220R SOLARSMART 260 SOLARSMART 260R IE Instruction booklet and warning Installator User Maintenance technician IE Instruction booklet and warning Installator Use...

Page 2: ......

Page 3: ...the safety valve optional 20 1 13 Positioning and fixing the backflow preventer 21 1 14 Pressure reducer optional 21 1 15 Expansion vessel 22 1 16 Starting 22 1 17 Start up 23 1 18 All the uses except...

Page 4: ...PONENT QUANTITY PIECES SOLARSMART solar collector with integrated storage 1 a b BASIC SUPPORT pair of galvanised sheet supports for flat roof 1 right 1 left c d e hammer head screw washer and nut for...

Page 5: ...e code 3 029921 3 029922 SAFETY AND ONE WAY UNIT with MF connections Article code 3 029918 PRESSURE REDUCER with MF connections Article code 3 029919 Follow the component assembly instructions if usin...

Page 6: ...be verified by a qualified and expert technician who must make sure of their correspondence with regulations and laws in force The manufacturer is not liable for any damage caused to the product resul...

Page 7: ...collector PROTECTION FROM BURNS Danger The water inside the collector can reach temperatures of approximately 90 C To prevent the danger of burns and or scalds be extremely careful when connecting th...

Page 8: ...anner Perforate with drill READ AND UNDERSTAND THE INSTRUCTIONS Read and understand the appliance s instructions before performing any operation carefully following the indications provided INFORMATIO...

Page 9: ...protective helmet must be worn PPE must be used when working at heights Protective goggles must be worn PERSONAL PROTECTIVE EQUIPMENT DANGER Generic danger Risk of falling from a height Risk of burns...

Page 10: ...of a suitable capacity and size 1 2 STRUCTURAL CHECK The SOLARSMART solar collector with integrated storage can be placed on the ground or on a structure attic covering balcony etc that can support t...

Page 11: ...standards in force The usual PPE must be worn for all in stallation operations drilling moving etc Risk of electric shock Only work near overhanging power cables where contact is possible if the powe...

Page 12: ...mendments 1 6 HARDNESS It is recommended to use water with a hardness of between 10 F and 30 F In the case of water with a greater hardness than 30 F it is recommended to carry out a softening treatme...

Page 13: ...long as possible Nearby obstacles trees buildings etc can temporarily shade the system and reduce even greatly its performance If positioning several collectors behind each other do not let them shad...

Page 14: ...14 4c 4b 4 4a 3c 3d 3a 3b A 1a 1c 1b A 3 1 2 4 INSTALLER USER MAINTENANCE TECHNICIAN INSTALLATION PHASES FLAT ROOF 13 Max 20 Nm SNOW LOAD WIND LOAD 1 2 kN m2 100 Km h...

Page 15: ...15 4g 4f 4d 4e 7 5 8 6 5a 5d 5c 5b 5a 5b 5c 5d A 6a A B 7b 7a 7a 7b 8b 8b 8a A SOLARSMART A B 110 150 2050 150 250 2050 220 500 2050 260 600 2050 INSTALLER USER MAINTENANCE TECHNICIAN...

Page 16: ...PLACE AND POSITION Carefully check the state of the cover and the suppor ting structure Get a structural technician to check the maximum loads of the building considering the weight of the system when...

Page 17: ...17 7c 7b 7 7a 3 1 2 4 A 5 25 cm 5 25 cm INSTALLER USER MAINTENANCE TECHNICIAN INSTALLATION PHASE SLOPED ROOF SNOW LOAD WIND LOAD 1 2 kN m2 100 Km h...

Page 18: ...18 7h 7g 7d 7e 7f 5 6 7 8 9 A A 13 13 INSTALLER USER MAINTENANCE TECHNICIAN...

Page 19: ...connection tighten the other connection using the torque wrench without exceeding a tightening torque of 20 Nm Using flexible hoses 1 10 USING FLEXIBLE HOSES Only removable connections e g stainless...

Page 20: ...LTERNATIVE TO THE SAFETY VALVE OPTIONAL ForinstallationsinItalyandincountrieswherearegulationsimilar to the one established by Ministerial Circular no 829571 of 26 March 2003 regarding accumulation wa...

Page 21: ...rned perfectly upwards in other words it must create a 90 angle as to the hori zontal surface 12 Before tightening the valve to the outflow connection connect between the valve and the user supply lin...

Page 22: ...grated solar collector is supplied with a plasticizer free PVC covering sheet which serves the purpose of blacking out the surface that captures the solar irradiation This will prevent the product fro...

Page 23: ...nd even damage the collector itself Allow the water to flow inside the system for a certain period of time in order to rinse out any deposits or residues that could have entered the tank during instal...

Page 24: ...ust be installed in the upper part of the solar collector opposite the side where the outflow connection is positioned M The antifreeze resistor L da 0 3 kW must be installed in the lower part of the...

Page 25: ...directly to the user without the addition of a boiler downstream In periods of less irradiation and colder months the 1 and 2 kW electric resistances serve as heat integration in order to bring the wa...

Page 26: ...high performing stainless steel cylinders 4 made of a special alloy that resists high pressures and also very corrosive water The cylinders are closed at their ends by special caps 5 made of thermopla...

Page 27: ...a period of up to 30 days it is possible to leave the plant filled with water and the solar collector uncovered Nevertheless before reusing the hot water it is a good idea to completely empty the tan...

Page 28: ...alve with serious consequencesfortheintegrityoftheaccumulationtank In this case it will be necessary to installasofteningorfiltrationdeviceupstreamfromthesystem carryoutadequatecleaningandifnecessary...

Page 29: ...d The connection drawing that is represented just like those on the following pages is purely indicative and only indicates how to connect the hydraulic connections and install the main supplied compo...

Page 30: ...on is the responsibility of the installer he she has the task of verifying if what is indicated in this manual complies with laws and re gulations in force at the installation place The manufacturer i...

Page 31: ...m 31 max 3BAR 3 6 CONNECTING MORE THAN ONE COLLECTOR If it is necessary to use several collectors parallel connection is strongly recommended The parallel connection must be made in a balanced manner...

Page 32: ...0mm 2050mm Gross surface area 1 52 m2 1 93 m2 2 77 m2 3 18 m2 Surface area when open 1 09 m2 1 48 m2 2 25 m2 2 64 m2 Absorption surface area 0 85 m2 1 13 m2 1 69 m2 1 98 m2 Effective ACS content 105 l...

Page 33: ...33...

Page 34: ...34...

Page 35: ...35...

Page 36: ...Cod 1 0435191ENG rev ST 004221 002 02 22 This instruction booklet is made of ecological paper immergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617...

Reviews: