Immergas 3.029368 Instruction And Warning Book Download Page 32

32

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

Programming menu

Menu item

Description

Adjustment range

Default value

Customised 

Value

P01 CH Set

This defines the boiler's flow temperature during heating

20 ÷ P02 °C

85

P02 Max CH Set

This defines the maximum settable flow temperature during 

heating

20 ÷ 95 °C

85

P03 Heating Hysteresis This defines the power-off hysteresis during the heating phase

2 ÷ 10 °C

5

P04 Anti-cycle CH

This is used to set a waiting time to avoid the boiler from 

switching on multiple times and frequently during CH mode

0 ÷ 15 minutes

3 minutes

P05 CH min time

This is the amount of time that the boiler needs to stabilise, 

when the burner runs at minimum power for the set amount 

of time

3 ÷ 10 minutes

3 minutes

P06 CH ramp

The amount of time that the boiler takes to reach the required 

temperature, number of degrees per minute (0 means no 

ramp)

0 ÷ 60 °C/minute

4 °C/minute

P07 CH post-

circulation

The amount of CH post circulation once the CH phase is 

finished

1 ÷ 30 minutes

3 minutes

P08 Available max 

heat out

This defines the maximum power percentage to be used 

during the set CH phase 

P09 ÷ 100%

100%

P09 Available max 

heat out

This defines the minimum power percentage to be used 

during the set CH phase 

0 ÷ P08%

0%

P10 -

Not used

14 l / minutes

P11 Electrodes anti-

humidity

This defines fan speed and operating mode, to avoid humidity 

inside the condensing module, which could otherwise 

cause the electrodes to malfunction (0 = disabled function, 

recommended value = 40) (RPM speed is calculated by 

multiplying the value displayed by 50)

P26 

÷

120

0

P12 P12Boiler’s 

modulation ratio 

It defines the boiler’s modulation ratio

(Do not modify)

÷ 

100%

10%

P13 Boiler power

Used to calculate the boiler power in the event of simple 

cascade. 

÷

 255 kW

68 kW = 65

P14 External probe 

curve

This is used to select the external probe operating curve 

(optional) (0 = disabled probe)

÷

 10

0

P15 External probe 

offset

This defines the CH offset in relation to the selected external 

probe curve

20 

÷

 70 °C

30 °C

P16 DHW set

This defines the DHW temperature

35 ÷ 65 °C

65 °C

P17 External D.H.W / 

3-waypump 

-    With a single boiler it controls an external 3-way. 

-    With single boiler and common flow probe, it lets you 

choose between an external D.H.W pump and a 3-way one.

-    With a simple cascade, it manages a D.H.W. pump 

(downstream an hydraulic separator).

0 = 3 Ways

1 = D.H.W. pump

P18 DHW hysteresis

This defines the DHW power-on hysteresis during CH

2 ÷ 10 °C

5 °C

P19 DHW post-

circulation

This is the post circulation time during DHW, once DHW 

production is finished

÷

 180 seconds

60 seconds

P20 Available max 

DHW pow

This defines the maximum power percentage to be used 

during the set DHW phase 

P21 

÷

 100 %

50 %

P21 Available max 

DHW pow

This defines the minimum power percentage to be used 

during the set DHW phase 

÷

 P20 %

0 %

P22

DHW flow 

temperature with 

thermostat

In combination with a storage tank and a separate thermostat, 

this defines the flow temperature during DHW operation

35 

÷

 90 °C

80 °C

P23 DHW modulation

Summed with the “Set San” (P16) parameter, this defines 

the flow temperature set that the boiler has to modulate the 

power on during DHW

÷

 30 °C

15 °C

P24 DHW off 

increment

This defines the time that the boiler allows the burner to 

switch off during DHW, by an increment of 5 °C on top of the 

flow temperature

÷

 255 seconds

60 seconds

P25 Max fan Speed

This defines the max fan speed and therefore the maximum 

relative boiler operating power (RPM speed is calculated by 

multiplying the value displayed by 50)

P26 

÷

 255 RPM 

x 50

68 kW Met. 112

68 kW LPG 111

P26 Min fan Speed

This defines the min fan speed and therefore the minimum 

relative boiler operating power (RPM speed is calculated by 

multiplying the value displayed by 50)

÷

 P25 RPM x 50

68 kW Met. 27

68 kW LPG 25

P27 Min pump speed Defines the minimum pump speed in heating mode at the 

minimum boiler power. 

Attention

: do not go below 30%

1 ÷ 100 %

30 %

Summary of Contents for 3.029368

Page 1: ...VICTRIX PRO 68 2 ErP IE Instruction and warning book 1 042849ENG 1 042849ENG...

Page 2: ......

Page 3: ...stablished by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions and by professionally qualified staff inte...

Page 4: ...9 Restoring central heating system pressure 26 2 10 System drainage 26 2 11Anti freeze protection 26 2 12Case cleaning 26 2 13Decommissioning 26 3 Boiler commissioning initial check 27 3 1 Hydraulic...

Page 5: ...dequate support if inserted correctly according to technical standards in walls made of solid or semi hollow brick or block In the case of walls made from hollow brick or block partitions with limited...

Page 6: ...is of their electrical protection rating 1 5 ANTI FREEZE PROTECTION Minimum temperature 5 C The boiler comes standard with an anti freeze function that activates the pump and burner when the system wa...

Page 7: ...e to restore the purity of the fuel Storage tanks in case of supply from LPG depot New LPG storage tanks may contain residual inert gases nitrogen that degrade the mixture delivered to the appliance c...

Page 8: ...pecified by current safety standards Attention the manufacturer declines any re sponsibility for damage or physical injury caused by failure to connect the boiler to an efficient earthing system or fa...

Page 9: ...adjuster via 2 wires Thermoregulation electrical connection Fig 1 4 Thermoregulation electrical connections must be carried out on the boiler terminal board eliminating jumper X40 Thermostat or On Off...

Page 10: ...aled chamber and fan assisted The boiler leaves the factory with B23 configuration to change the configuration of the boiler to type C sealed chamber and fan assisted disassemble the 80 adapter the br...

Page 11: ...1 3 m Terminal complete with vertical ex haust 80 Exhaust m 3 DUCT TYPE Equivalent length in m of concentric pipe 80 125 Concentric pipe 80 125 m 1 1 0 m Concentric bend 90 80 125 1 9 m Concentric ben...

Page 12: ...a concentric bend coupling in order to ensure sufficient space to carry out the tests required by law upon commissioning External grid The intake exhaust terminal if properly installed is pleasant to...

Page 13: ...to the relevant groove Fix it to the lid using the previously disassembled sheet steel plate 3 Installation of the fake aluminium tile replace the tiles with the aluminium sheet 5 shaping it to ensure...

Page 14: ...mum length MAX L Fig 1 15 The kit with this configuration can be extended up to a max measurement of 28 0 m with Victrix Pro 68 2ErP including the terminal Using the 80 vertical terminal for direct di...

Page 15: ...al 3 and external 4 wall sealing plate has been fitted This will ensure sealing and joining of the elements making up the kit Horizontal kit 80 with exhaust in flue Kit assembly Fig 1 21 install the 8...

Page 16: ...the end of work and on commissioning of the ducted system The instructions in the project or technical report must likewise be followed in cases provided for by the standard and current technical reg...

Page 17: ...n domestic hot water mode the circulator pump always runs at maximum speed Pump release If after a prolonged period of inactivity the circulation pump is blocked unscrew the front cap and turn the mot...

Page 18: ...e 10 Flue probe 11 Condensation module 12 Air pressure switch 13 Fumes hood 14 Air intake pipe 15 Igniter 16 Heat exchanger safety thermostat manual reset 17 Heat exchanger safety thermal fuse 18 Igni...

Page 19: ...d block circuit breaker switches andofthethermometer notsuppliedasstandard with the boiler must be set up as described in the installation instructions in compliance with theprovisionsofthe R collecti...

Page 20: ...tral heating circuit pump CMI 1 13 Zone 2 central heating circuit pump CMI 2 14 Zone 3 direct circuit pump CD 15 Storage tank unit feeding pump 16 Zone 1 safety thermostat CMI 1 17 Zone 2 safety therm...

Page 21: ...eze is not used b shut off all electrical water and gas supplies N B in the case of maintenance interventions on the boiler that lead to the closure of one or both system cut off cocks the boiler must...

Page 22: ...indicates a base value at which the system has been designed and calculated and however not less than 0 5 bar Open the gas cock upstream from the boiler Turn the main switch and the boiler runs a self...

Page 23: ...If a certain amount of time lapses without saving the value the boiler will exit setting mode and maintain the previous setting Stand by mode by pressing buttons A and C at the same time it is possib...

Page 24: ...error may be caused by a failure in one of the two probes Press the Reset button 1 0A18 Flow and return NTC probe temperature detection incorrect If the board detects a sudden drop in temperature on o...

Page 25: ...ct on the flue NTC probe 2 1 0E81 Flow and return NTC probe temperature detection incorrect in stand by With the boiler in stand by the board detects an anomalous difference between the NTC probe flow...

Page 26: ...drained completely or antifreeze substances must be added to the heating system water In systems that are drained frequently filling must be carried out with suitably treated water to eliminate hardn...

Page 27: ...ction ing of fans check that the intake and or exhaust terminals are not blocked ensure activation of all adjustment devices seal the gas flow rate regulation devices if settings are modified check se...

Page 28: ...h X90 Boiler configuration jumper Y1 Gas valve Z1 Anti jamming filter 1 External reset optional Configure the corresponding parameters when connecting in simple cascade or when con necting in system s...

Page 29: ...DIAGRAM Key A2 Electronic board A4 Display board B1 Flow probe B1 2 System side flow probe optional B2 Domestic hot water probe optional B4 External temperature probe optional B5 Return probe B10 Flue...

Page 30: ...2 Domestic hot water probe NTC optional B4 External probe optional M2 Plant CH pump optional M30 3 way valve optional Note probe B1 2 B2 B4 Connection cable diameter 3 7 mm Cable section 0 5 1 5 mm2 1...

Page 31: ...tage of CO2 in flue gases The over temperature safety thermostat the flow probe or the return probe are triggered frequently It can depend on the lack of water in the boiler little water circulation i...

Page 32: ...urve optional 0 disabled probe 0 10 0 P15 External probe offset This defines the CH offset in relation to the selected external probe curve 20 70 C 30 C P16 DHW set This defines the DHW temperature 35...

Page 33: ...er takes priority in relation to the value set from the pushbutton panel P33 Antifreeze function activated by the common flow probe It activates the antifreeze function launched by the common flow pro...

Page 34: ...gas circuit N B all boiler adjustment operations must be carried out by a qualified technician e g Immergas After Sales Assistance 3 12 ADJUSTMENT OF THE AIR GAS RATIO Calibration of minimum CO2 Turn...

Page 35: ...e request is deactivated below 1 V Notes If P37 is set at 0 it is not active when the boiler is in stand by or summer mode The calculated set is limited by the P02 20 C range Themaximumandminimumtempe...

Page 36: ...replaced at least every two years regardless of their state of wear Check that the burner is intact that it has no deformations or cuts and that it is properly fixed to the combustion chamber lid oth...

Page 37: ...to de tach it from the central hooks and then slide it downwards take the two clamping screws out 4 from the control panel with their rings 5 press the two side hooks 7 and tilt the control panel 6 re...

Page 38: ...38 3 15 1 6 8 9 9 12 12 10 11 13 13 13 13 A A Rif A 7 7 INSTALLER USER MAINTENANCE TECHNICIAN Ref A...

Page 39: ...41 5370 4 71 5320 57 0 49020 6 19 5260 4 54 5210 55 0 47300 5 97 5140 4 38 5100 53 0 45580 5 75 5030 4 22 4980 51 0 43860 5 54 4910 4 06 4860 49 0 42140 5 32 4780 3 91 4740 47 0 40420 5 10 4660 3 75 4...

Page 40: ...ue flow rate at min heat output kg h 13 13 CO2 at Q Nom Min 9 85 8 95 10 60 9 75 CO with 0 O2 at Nom Min Q Nom Min ppm 240 1 180 2 NOX at 0 of O2 at Q Nom Min mg kWh 81 5 58 4 Flue temperature at nomi...

Page 41: ...0 Nom Min 107 3 107 2 Heat loss at casing with burner On Off 80 60 C 0 39 0 80 Heat loss at flue with burner On Off 80 60 C 0 01 1 9 Central heating circuit max operating pressure bar 6 0 Central heat...

Page 42: ...Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type appliance configuration ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn...

Page 43: ...eat output in high tempera ture mode 4 87 4 At 30 of nominal heat output in a low temperature mode P1 20 9 kW At 30 of nominal heat output in a low temperature mode 1 95 9 Auxiliary electricity consum...

Page 44: ...n for the domestic hot water function AEC Yearly fuel consumption for the domestic hot water function AFC Seasonal room heating yield s 91 Domestic hot water production yield wh For proper installatio...

Page 45: ...Supplementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at...

Page 46: ...The energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficiency is influenced by fur ther...

Page 47: ...contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Auxiliary electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100...

Page 48: ...ncy under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 ___ 2 1 1 x ___ 10 x ___ ____ ____ Auxiliary electricity...

Page 49: ...49...

Page 50: ...50...

Page 51: ...51...

Page 52: ...mmergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 042849ENG rev ST 003901 000 01 19 Inglese p...

Reviews: