 Mounting

 NOTICE 

Damage of the valve

The valve may be damaged through in-

appropriate installation.

 

Only trained and authorized specialists 

may install the valve.

 

Only use appropriate tools and suitable 

sealing materials.

 

Make sure that the valve is mounted in 

flow direction.

 

Make sure not to distort the valve body, 

particularly in case of a misaligned pipe-

work.

There must be no mechanical loads ap-

plied to the solenoid.

 

Do not use solenoid as a lever during 

mounting.

Valve only firmly closes in flow direction. 

Inflow against the valve’s flow direction 

may lead to the destruction of compo-

nents.

 

Implement adequate measures if back flow 

is to expect. Examples:

 

By providing a safety shutdown and a relief 

of the compressed air systems on the 

valve’s inlet side.

 

By adding check valves to the pipe sys-

tem.

The valve subassembly may get damaged 

by external loads at the operating site.

 

Protect valve from objects falling down.

 

Protect valve from direct weather influen-

ces.

Dimensions

of valve body with valve cover in mm

L

 = length of the valve body

B

 = diameter of the valve cover

84070, 84080

Housing type 1

Housing type 2

ND

L

B

ND

L

B

12

67

51

20

74

62

Meaning of ND in G thread and NPT thread

ND

12

20

G

G 1/2

G 3/4

NPT

1/2 NPT

3/4 NPT

 7.1 

 Conditions of installation

Compliance with operating limits

Ensure to comply with the operating limits pri-

or to mounting the valve. Observe the valve’s 

data sheet.

Planning of the pipe system

Buschjost recommends to include manual stop 

valves and drain valves in the plant so that the 

pipe system may be depressurized and drained 

prior to working on the valve.

Mounting position of the valve

The mounting position is not determined.
preferably: solenoid vertical on top 

    

 7.2 

 Preparation

 

Check the valve for externally visible 

damages.

 

Leave the valve in its protective package 

prior to mounting.

 

Make sure that there is enough free space 

for dismantling the valve in case of main-

tenance.

 

Clean the pipe system prior to mounting the 

valve.

 7.3 

 Mount valve to pipe line

 

Mount the valve to the designated pipeline. 

Comply with existing connections.

 

Arrange the valve according to the 

pipeline’s flow direction. An arrow on the 

valve’s body marks the flow direction.

P

A

Arrow shows flow direction

1. Take valve out of the packaging immediately 

prior to mounting. 

2. Take out the blanking plugs 

 1 

 from valve 

inlet and valve outlet.

1

1

Take out blanking plugs

3. Install a strainer in front of the valve inlet 

P

 

if necessary.

4. Firmly seal the threads of the pipeline 

 2 

 

with an appropriate sealing material (e.g. 

PTFE sealing tape 

 3 

).

2

2

3

Firmly seal pipeline’s thread

5. Attach the pipelines to the valve. 

NOTICE

 

Make sure not to distort the valve body.

6. Attach pipelines threads 

 2 

 to the connecti-

on threads of the valve.

2

2

Connect valve with pipe line

A2

Summary of Contents for Buschjost 84070 Series

Page 1: ...2 preset order of instructions 1 part number according to part list 1 flexible part number section q replace spare part DANGER WARNING CAUTION NOTICE embedded safety message given limits or fixed val...

Page 2: ...ng electri cal engineering hydraulic und pneumatic Trained specialists must be authorized to commission ground and designate devices systems and power circuits according to the standards of safety tec...

Page 3: ...s deli very packaging Take valve out of the packaging immedia tely prior to assembly prolonged storage at 10 C to 20 C Avoid during transport mechanical loads falling off tipping over damages to the e...

Page 4: ...with operating limits Ensure to comply with the operating limits pri or to mounting the valve Observe the valve s data sheet Planning of the pipe system Buschjost recommends to include manual stop val...

Page 5: ...figuration of the socket insert y Protective earth PE 7 Terminal 1 8 Terminal 2 3 Attach the other wires to the terminals 7 and 8 of the socket insert 5 DANGER Ensure correct polarity while connecting...

Page 6: ...o increase the pressure slowly After each test depressurize the valve outlet first Test for internal tightness 1 Close the valve solenoid of NC valves de energized NO valves energized 2 Flood the valv...

Page 7: ...eplace the o ring 12 that is situated in the valve cover 6 4 12 11 Replace o rings 3 Screw the core tube 10 on valve cover 4 tighten only hand tight Spare parts related to the valve body Replace the u...

Page 8: ...ile available online at http www buschjost com service other documents goods return declaration 3 Fill out the goods return declaration and fulfill the requirements 4 CAUTION Consider the weight of th...

Reviews: