10
11
3. USING THE HOIST
Operate the hoist with the Winch Key. Make
sure to keep tension on the rope by adding
the hook weight to the hook.
4. COUNTERWEIGHT
Rotate the upper structure 90
degrees.
Place the main counterweight
on the backside of the crane
and push it upwards.
Secure it in place with pins
from bag 1.
Click the Counterweight
Back Plate into position.