background image

Interchangeable Art

System Installation Instructions

Included with System

• Frame

• Blank Panel

• Template

• 10 Anchor Screws

• 2 Latches

• 1 #6 Screw

• Safety Strap

Space Requirements: 

The minimum space requirement: 26 1/16” w x 18 1/16” h 

Installation takes approximately 30 minutes.

Tools Required

• Pencil

• Level

• Drill with 1” bit

• Tape measure

• Drywall plunge saw or zip saw

• Cross thread screwdriver

Step One

Before you begin, locate any electric lines, gas lines, plumbing or wiring  

before cutting into the drywall. Take care to avoid cutting or damaging 

these items. Shut off all electrical power and gas to the installation area.

• Measure and 

fi

 nd center point of the area to be installed.

• Mark center line of frame, both vertically and horizontally.

• Use your level to mark line on the wall.

Step Two

• Place the included cardboard template on your center line marks.

• Use your level to extend the line both vertically and horizontally if 

   needed.

• Use your pencil to draw a line around the template, marking the area

   to be cut.

Step Three

• Use drywall plunge saw or zip saw to cut frame outline, taking care to  

   avoid cutting or damaging any electrical lines, gas lines, plumbing 

   or wiring.

• Remove the cut-out.

• Clear any debris from area.

Step Four

• Set frame (with latch slots on the top) into opening to check for 

fi

 t.

• If there is a stud located directly behind either latch hole, drill a 1”hole 

   in the stud to clear a space for the latch.

Reviews:

Related manuals for Interchangeable Art