Operation
2020-02-26
227
12. Press the button
Layout Check...
in the symbol bar to verify your new
layout.
A summary for the new layout will appear.
13. Save your created layout by pressing the button
Save
and follow the
instructions. If you externally store a layout, it will obtain the file
ending .dtl.
Default Monitor Layout
To define a default layout, proceed as follows
1. Open an already created layout.
2. Press the button
Set As Default
in the symbol bar.
The open layout will be stored as default layout.
3. To delete a default layout, press the button
Delete Default
in the
symbol bar.
4. If there is open another layout other than the default layout, you can
display the default layout by pressing the button
Load Default
in the
symbol bar.
Pos : 133 /806- IHSE/ Betri eb/Redundanz funkti on/480-xx @ 15\mod_1433248552414_6. doc @ 161934 @ 2 @ 4
6.11 Redundancy Function
KVM extenders with redundant connectors for interconnect cables can be
simultaneously operated with both connectors at a single Matrix or a
Matrix Grid (from firmware version V04.00).
The connector labeled with
Link 1
at the KVM extender is meant for the
primary connection. If the connection on CON or CPU Unit side is
interrupted due to any problem, the connection will be automatically re-
established through the second connector labeled with
Link 2
.
For this kind of redundancy function, there is no need for any configuration
of the KVM matrix or the KVM extenders.
If needed, you can manually switch between
Link 1
and
Link 2
at the
CON Unit (see Chapter 6.6, Page 219).