4. Connection

Caution: Electrical connections !

The electrical connection must only be performed 
by qualified electricians or persons trained in elec-
trical safety. Work on equipment must be carried 
out with the equipment disconnected from the 
mains. It must also be ensured that the equipment 
cannot unintentionally be made live again.

Note the connection voltage!

Standards and specifications for electrical work 
must be observed. Particular attention must be paid 
here to conformity of the operating voltage (as em-
bossed on the equipment) with the supply voltage.

4.1 Protective conductor

It is imperative that the protective conductor is con-
nected, where available. Otherwise the connection 
of the protective conductor of the heating system 
must be checked as part of the mechanical connec-
tion to the machine.

4.2 Ex area

Operation of the heating systems in an Ex area is 
not permissible.

4.3 Connecting line

To avoid short circuits, the connecting lines must 
be routed such that they cannot come into contact 
with sharp edges or objects. It must be ensured that 
the terminal area is protected against the penetrati-
on of materials (e.g. oils, plastics, moisture, greases 
and gases).

Note:

The appropriate connection variant for the terminal area 
(e.g. cables, stranded wires, connectors, busbars etc.) must 
be chosen depending on the ambient temperatures.

5. Technical data

5.1 Surface temperature

The specifications given below are maximum values for the 
heating side and must not be exceeded:
HAK type: 

                  450 °C max.

6. Disas assembly

The heat-cool combinations are delivered fully assembled 
for transport and insurance reasons. Disassembly and as-
sembly must be carried out as described below to achieve 
the positive-locking fit required for operation.

6.1 Disassembly

Step 1: 

Open and remove the upper half of the cooling 

                  jacket.
Step 2: 

Loosen clamping screws of cup spring caps on 

                 the top heat-cool segments and then open these 
                 segments.
Step 3: 

Loosen the retaining straps on the lower half of 

                 the cooling jacket and remove the screws and 
                 transport ring.
Ready for installation ! 

Dear customer,

Thank you very much for placing your trust in heating ele-
ments from Keller Ihne + Tesch, part of the IHNE & TESCH 
Group. We have been developing and producing high-
quality electrical heating technology of the kind you have 
opted for since 1932.

1. General

Our heating elements are high-quality products made in 
Germany that have be subjected to rigorous quality checks 
throughout all stages of development and production. A 
high degree of vertical integration and the many years of 
experience of our employees ensure that our high level of 
performance can be maintained.
This quality standard will give you a guarantee of continued 
reliable use of the heating elements over long periods of 
time, provided that the technical information set out below 
is observed.
If you have any other questions on installing and using the 
heating elements or any of our other products not covered 
in the information below, our field service staff and sales 
engineers will be happy to help.
Our heating systems conform to the applicable provisions 
of relevant EU directives and Equipment and Product Safe-
ty Act and bear the CE mark.

2. Applications

Our heat-cool combinations are ideal for heating and coo-
ling solids (extruder and injection moulding applications).
The heating elements are components, not operational 
devices. They are intended for use in industrial electrical 
heating systems.

3. Safety information

The instructions for use must be read carefully and under-
stood prior to commissioning the heating systems. Incor-
rect assembly, selecting the wrong heating system and 
regulating a heating system incorrectly will cause defects 
and accidents.
For safety reasons, the heating systems may only be used 
for the applications described in these instructions for use. 
General operating instructions and safety information must 
be observed. When assembling the system, the safety ins-
tructions relevant to the installation location and generally 
accepted technical rules and standards must be observed.
Heating systems must not under any circumstances be 
commissioned if there are visible signs of (transport) dama-
ge.
Heating systems must not be commissioned until it has 
been ensured that the insulation resistance is 

 1 MOhm.

The surface temperature of the heating systems must not 
cause the temperature of the material to be heated to rise 
to a critical level that could, for example, trigger a fire, ex-
plosion, the emission of smoke or gas, etc.
The heating systems must not be commissioned until they 
have been mounted such the entire contact surface cannot 
move.
Operating conditions other than those described in the 
instructions for use will cause heating systems to malfunc-
tion or fail. Special applications must be approved by IHNE 
& TESCH, Keller Ihne + Tesch.

Caution: Risk of combustion!

High temperatures occur during operation. All sur-
faces must be cold (

 40°C) when performing work 

on heating systems.

 