![IGM BR300 Operating Instructions Manual Download Page 2](http://html1.mh-extra.com/html/igm/br300/br300_operating-instructions-manual_3946772002.webp)
-2-
www.igmtools.com
Operating instructions EN
Please read this manual thoroughly and follow the safety instructions in it! Technical changes
and printing errors reserved!
Dear customer,
This manual contains important instructions and information for the installation and proper use of the BR300
edgebander.
This manual is part of the machine and therefore it should not be kept elsewhere than in the vicinity of the machine
so that you can be consulted at any time by you or other persons operating the machine.
Please read and follow the safety instructions!
Carefully read these instructions before using the machine. Operation of the machine will be simpler
and you will also lower the risk of injury while eliminating the probability of incorrect operation and
possible damage to the machine.
Because of our policy of constant improvement, the design, construction or pictures may differ slightly.
Should you discover any mistakes, please contact us at [email protected].
1. DECLARATION OF CONFORMITY
The undersigned: IGM nástroje a stroje s.r.o.
Address: Ke Kopanině 560
Tuchoměřice, Praha-západ, PSČ 252 67
Czech Republic, EU
Phone no: +420 220 950 910
Certifies the
Product:
Manual Edgebander for ABS
Type:
BR300
Manufacturer: CO-MATIC Machinery Co.,
Ltd.,No. 473-16,
San Feng Road, Houli District, Taichung
City,Taiwan, R.O.C. 42156
We declare under our sole responsibility that the
productdescribed in this manual is in conformity
with the followingstandards: EN ISO 12100, EN ISO
13857, EN 349, EN 953,EN 60204-1, EN ISO 11202, EN
55014-1, EN 55014-2 withthe provisions of Directives
2006/42 / EC, 2004/108 / EC,2006/95 / EC, 2002/95 /
EC
Signed: Ivo Mlej
Managing Director
TABLE OF CONTENTS
PAGE
1. DECLARATION OF CONFORMITY
2
2. WARRANTY SERVICE
3
3. SAFETY INSTRUCTIONS
3
3.1 Advice
3
3.2 General safety instructions
3
3.3 Risks
4
3.4 Important notice
4
4. SPECIFICATIONS OF THE MACHINE
4
4.1 Machine description
4
4.2 Technical data
5
4.3 Contents
5
5. TRANSPORT, UNPACKING AND ASSEMBLY
5
5.1 Transport and unpacking
5
5.2 Assembly
5
5.2.1 Mounting the corner guide
5
6. SET-UP AND ADJUSTMENT
5
6.1 Preparing for work
5
6.1.1 How to measure and set up the width of the tape
5
6.1.2 Control and gauge set up on the supporting table
6
6.1.3 Adjusting the amount of glue
6
6.1.4 Adjusting tape thickness
6
6.1.5 Setting length of tape
6
6.1.6 Fastening the workpiece before edgebanding
7
6.1.7 Refilling glue
7
6.2 Before turning on
7
6.3 Functions of control panel
7
7. OPERATING THE MACHINE
8
7.1 Edgebanding
8
7.2 Stationary use
8
8. MAINTENANCE AND CONTROL
8
8.1 Maintenance after work
8
8.2 Preventive check
8
9. MALFUNCTION ASSISTANCE
9
9.1 Problem solving
9
10. ENVIRONMENTAL PROTECTION
9
11. ACCESSORIES (spare parts)
9