1
SAMOS DEEP
LINE ASSEMBLY INSTRUCTIONS
IGLOO Stary Wiśnicz 289, 32-720 Nowy Wiśnicz, Tel. 14 662 19 10 / Fax: 14 662 19 12 [email protected] / www.igloo.pl
en
ORIGINAL MANUAL
22.05.2019
READ CAREFULLY BEFORE USE
KEEP FOR FUTURE REFERENCE
LINE ASSEMBLY INSTRUCTIONS
REVISION
PAGE: 1/10
TYPE: SAMOS DEEP
NO.
DATE
NO.
DATE
DOCUMENTATION NO.:
A
D
NO.: 0
B
E
DATE of 1st issue:
26.05.2019
TABLE OF CONTENTS
C
F
NO.
SECTION
PAGE
REV.
STATUS
DOCUMENTA-
TION NO.
0
TABLE OF CONTENTS
1
-
x
1
Unpack
2
-
x
2
Prepare the fasteners delivered with the counter
2
-
x
3
Prepare necessary assembly tools
2
-
x
4
Prepare for line assembly
3
-
x
4.1
Unpack the shelves, screens and worktops
3
-
x
4.2
Remove the louvre
3
-
x
4.3
Remove the fans
3
-
x
4.4
Remove the ventilation grilles
3
-
x
5
Apply the sealant mastic
4
-
x
6
Remove the socket head cap screw near the top lamp
4
-
x
7
Place the modules (single counters) in line
4
-
x
8
Align all installation holes
5
-
x
9
Place the modules app. 5 mm apart
5
-
x
10
Join the modules using delivered fasteners
5
-
x
11
Level the set using the spirit levels
5
-
x
12
Install the fans
6
-
x
13
Install the louvre
6
-
x
14
Install the worktops
6
-
x
14.1
Place the worktops on the set
6
-
x
14.2
Glue the worktops
6
-
x
14.3
Seal the worktops
7
-
x
14.4
Remove the film from the two-sided profile of night covers
7
-
x
14.5
Apply adhesive on the profile
7
-
x
14.6
Install the profile on the granite worktop
7
-
x
15
Adjust front glass panels
8
-
x
16
Apply sealant on the modules joints
8
-
x
17
Place the shelves
8
-
x
18
Place the screens
9
-
x
19
Install the partitions (if any)
9
-
x
20
Install the client shelf (if any)
9
-
x
21
Install the night covers
9
-
x
22
After the line assembly and before the start-up, connect all plugs between
the modules
10
-
x
23
Have the counters connected to the cooling and power infrastructure by
an authorized staff indicated by the customer
10
-
x
KEY:
-
First issue
A, B, ...
Rev. index
X
No. of section corresponding to documentation No.