17
9. Commissioning
Caution! Danger of scalding!
Beware, the device is hot during commissioning and operation!
9.1 Commissioning of unit together with the boiler
Check specifications of material, pressure and temperature!
•
Close drain valve (14) (see sketch chapter 5).
•
Fully open shutoff valves (W+D).
•
Check position of magnetic switch (2) in operating condition and adjust the height if
necessary.
•
The magnetic switch (2) must be correspondingly affixed onto the transmitter tube (4).
9.2 Commissioning of unit if boiler is already in operating condition
•
Close drain valve (14) (see sketch chapter 5).
•
Slowly open shutoff valve (W) followed by shutoff valve (D).
•
Check position of magnetic switch (2) in operating condition and adjust the height if
necessary.
•
The magnetic switch (2) must be correspondingly affixed onto the transmitter tube (4).
Danger